← Public RFP analyses

Panorama Road At-Grade Rail Crossing Improvements

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; planetbids.com/portal/portal; Section 2 – Scope And Control Of The Work .; submitted via “Q&A” through the City’s Electronic Bidding System, PlanetBids Vendor Portal.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; with the exception of when the grade of curb and gutter is less than 0.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; Contractor must use an Additional Insured Endorsement approved by the City.; and agents are added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; Control Plan" that has been prepared by either a licensed Traffic or Civil Engineer.; 2022 Panorama Road; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA.

BID WITH CAUTION 14 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; planetbids.com/portal/portal; Section 2 – Scope And Control Of The Work .; submitted via “Q&A” through the City’s Electronic Bidding System, PlanetBids Vendor Portal.; Failure to be so licensed shall result in rejection of the proposal as non-responsive.; with the exception of when the grade of curb and gutter is less than 0.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; Contractor must use an Additional Insured Endorsement approved by the City.; and agents are added as additional insured under this policy.; 7 Deductibles and Self-Insured Retentions.; or eliminate such deductibles or self-insured retentions.; Control Plan" that has been prepared by either a licensed Traffic or Civil Engineer.; 2022 Panorama Road; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA.

Submission deadline

2022-01-20

Red flag teaser

14 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

14 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-3 SUBCONTRACTS 2-3.2 Self Performance. The Contractor shall perform, with its own organizatio

Liquidated Damages

high

…ty to accommodate another contract, even with the City. For each incident the Contractor does not submit an updated weekly schedule, liquidated damages will be assessed as described in Section 6-9 of these Special Provisions. The "Notice to Proceed" shall be as follows: The Contractor’s construction schedule shall be submitted at the Pre-Construction Conference. Upon review of the Contractor's co

Prevailing Wage / Certified Payroll

high

…ontractor is aware of and stipulates that Contractor will also comply with the following sections of the California Labor Code: a. Section 1775 prescribing sanctions for failure to pay prevailing wage rates; b. Section 1776 requiring the making, keeping and disclosing of detailed payroll records and prescribing sanctions for failure to do so; Bid 7874 – Special Provisions Part 1, Page 3 11/16/202

Project Labor Agreement / Union Requirements

high

…rating similar equipment already on the project or, in the absence of such other workers, at the rates for such labor established by collective bargaining agreements for the type of workers and location of the work, whether or not the owner-operator is actually covered by such an agreement. Copies of the "Labor Surcharge and Equipment Rental Rates" publication are available online at: https://dot

Locked analysis

All deadlines table

1 dates
ItemDue
Bids are to be submitted no later than 2022-01-20

Locked analysis

Required certifications checklist

21 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all