On-Call Securement Services

The City of Sacramento Community Development Department seeks an on-call contractor to provide emergency repairs and securement services for private abandoned properties in Sacramento, California. The work is nonprofessional services (general contracting) for residential and commercial properties, including board-up of windows and doors, roof coverings, electrical and plumbing restoration, and debris removal. The contractor will be on-call 24/7 and used on a rotation basis as needed, with a base contract period of July 1, 2016 through June 30, 2017, plus two optional renewal years at the City's discretion. This is a City contract with no federal funding, subject to local business enterprise (LBE) participation requirements. Source scope cues include: CITY OF SACRAMENTO Community Development; CITY OF SACRAMENTO Bid No; Bid Security. Bid Security is: [ ] Required [ X ] Not Required If required, bid security approved by the City must accompany the bid, in the amount of ___ % of the total am; planetbids.com/portal/portal; The City assumes that all invoices are paid within the discount terms (all discounts are taken).; Emergency/Declared Disaster Requirements.; terms and conditions that apply during non-emergency/disaster conditions.; located in the City or unincorporated county of Sacramento.; (2) Description of services billed under this invoice.; proof of an incorrect billing shall be on the Contractor.; acceptance of material, or from date of receipt of invoice, whichever is latest.; on delivery and acceptance of goods and on receipt of Contractor's invoice.; of the contract action, the Scope of Work, or any change that impacts the cost/price or schedule.; All bids shall be based upon the scope of work as described in the Scope of Work (SOW).; 01 The work to be performed comprises general board-up repair to dangerous buildings.; with a B-1 license, insured and bonded to do business in the City of Sacramento.; contractor shall respond to an emergency within sixty (60) minutes.; governing repair work as applicable to individual locations being repaired..

BID WITH CAUTION 22 red flags detected : Back-Charge / Set-Off Rights for Damage and Non-Performance

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

The City of Sacramento Community Development Department seeks an on-call contractor to provide emergency repairs and securement services for private abandoned properties in Sacramento, California. The work is nonprofessional services (general contracting) for residential and commercial properties, including board-up of windows and doors, roof coverings, electrical and plumbing restoration, and debris removal. The contractor will be on-call 24/7 and used on a rotation basis as needed, with a base contract period of July 1, 2016 through June 30, 2017, plus two optional renewal years at the City's discretion. This is a City contract with no federal funding, subject to local business enterprise (LBE) participation requirements. Source scope cues include: CITY OF SACRAMENTO Community Development; CITY OF SACRAMENTO Bid No; Bid Security. Bid Security is: [ ] Required [ X ] Not Required If required, bid security approved by the City must accompany the bid, in the amount of ___ % of the total am; planetbids.com/portal/portal; The City assumes that all invoices are paid within the discount terms (all discounts are taken).; Emergency/Declared Disaster Requirements.; terms and conditions that apply during non-emergency/disaster conditions.; located in the City or unincorporated county of Sacramento.; (2) Description of services billed under this invoice.; proof of an incorrect billing shall be on the Contractor.; acceptance of material, or from date of receipt of invoice, whichever is latest.; on delivery and acceptance of goods and on receipt of Contractor's invoice.; of the contract action, the Scope of Work, or any change that impacts the cost/price or schedule.; All bids shall be based upon the scope of work as described in the Scope of Work (SOW).; 01 The work to be performed comprises general board-up repair to dangerous buildings.; with a B-1 license, insured and bonded to do business in the City of Sacramento.; contractor shall respond to an emergency within sixty (60) minutes.; governing repair work as applicable to individual locations being repaired..

Submission deadline

TBD

Red flag teaser

22 red flags detected including Back-Charge / Set-Off Rights for Damage and Non-Performance.

Locked analysis

Full red flag list with excerpts

22 found

Back-Charge / Set-Off Rights for Damage and Non-Performance

high

Any damage to either public or private property which was caused by the Contractor shall be repaired or replaced at the Contractor's expense... If the work is not completed within the time specified and to the satisfaction of the Inspector, the total cost for eliminating the problem or completing necessary repairs will be deducted from the payments owing to the Contractor from the City... the City may cause such action to be taken by the City work force and/or other contractors, and shall charge the cost thereof to the Contractor, or may deduct such cost from an amount due Contractor... If the Contractor fails to correct a deficiency within fifteen (15) days after notification, a deduction may be made from the agreement amount. The deduction shall be ten (10) percent of the estimated value of the services performed during the month, not to be less than $1,000 nor exceed $10,000.

Contractor Liable for Emergency Response Costs if Unreachable

high

The Contractor will be required to have a twenty four (24) hour emergency phone number where he/she can be reached with no more than a ten (10) minute delay in call back time. Once notified, contractor shall respond to an emergency within sixty (60) minutes... Should the Contractor be unreachable, as specified in Item 1.04 of this agreement, the City may cause such action to be taken by the City work force and/or other contractors, and shall charge the cost thereof to the Contractor, or may deduct such cost from an amount due Contractor. If the Contractor is unable to respond to the emergency after being contacted within the time frame specified in Item 1.04, the City reserves the right to effect such repairs itself or with another contractor. Should it also be determined that the necessary repairs were due to the Contractor's lack of performance under the terms and conditions of this contract or through Contractor's negligence, the Contractor may be liable for all charges to effect such repairs.

Mandatory Pre-Bid Conference Attendance Required

high

If a mandatory Pre-Bid Conference is indicated on the Invitation for Bid, all bidders are required to attend the conference. Failure to attend this conference will result in rejection of your bid. If a mandatory Pre-Bid Conference is indicated on the Invitation for Bid, bid packages will be made available only through the time and date of the conference. Subsequent addenda, if applicable, will be furnished only to those bidders who attended the Mandatory Pre-Bid Conference.

Termination for Unsatisfactory Performance with Limited Notice

high

If the Contractor fails to correct the unsatisfactory conditions within 5 days, the Procurement Services Manager may declare this contract terminated upon 30 days written notice and contract with another Contractor. The City shall have no obligation to give more than two notices of unsatisfactory performance in any calendar year. In the event two such notices of unsatisfactory performance are given in any calendar year, and in the event that Contractor(s) shall again fail to satisfactorily perform services pursuant to this contract, City may thereupon terminate this contract immediately. In the event of termination hereunder, the Contractor and/or surety will be liable and assessed for any and all costs for the re-procurement of the contract services.

Bid Bond Required

medium

…, in the amount of ___ % of the total amount of the bid. Bid security can be in the form of a cashier's check, certified check, or a bid bond from a surety company authorized to do business in the State of California. Bid securities will be returned to all except the three lowest Bidders within ten days after the opening of bids. The bid security of the two unsuccessful Contractors will be return

Locked analysis

All deadlines table

6 dates
ItemDue
Mandatory Pre-Bid Conference TBD
Questions Due TBD
Bid Submission Deadline 2016-06-08
Contract Award Notification TBD
Project Start Date 2016-07-01
Project Completion (Base Period) 2017-06-30

Locked analysis

Required certifications checklist

19 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Include contractor license information
  • Acknowledge all addenda
  • Confirm mandatory pre-bid meeting or site visit attendance
  • Verify requirement: Commercial General Liability Insurance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all