On-Call Masonry Wall Repair Services (Re-Posted)

The City of Sacramento is soliciting bids for on-call masonry wall repair services on an as-needed basis. The contractor will respond to damaged masonry walls within the city, render them safe from falling hazards using temporary measures (barricades, plywood barriers), prepare repair quotes within 48 hours, and execute permanent repairs upon city approval. This is a non-professional services contract for repair/maintenance work in Sacramento, California, subject to prevailing wage requirements (California Labor Code § 1720 et seq.) for work exceeding $15,000. The contract term runs July 1, 2017 through June 30, 2018, with optional extensions through June 30, 2020, with an estimated total value not to exceed $100,000 over three years. Source scope cues include: CITY OF SACRAMENTO Date and; CITY OF SACRAMENTO supply in; planetbids.com/portal/portal; If necessary, the burden of proof and cost of analysis to or replacement.; Sacramento taxes, permits, or fees.; located in the city or unincorporated county of Sacramento.; meets the minimum scope and limits of insurance coverage specified in subsection A, above.; a public works project, using the online PWC-100 form.; PREVAILING WAGE, APPRENTICES, PENALTIES, & CERTIFIED PAYROLL.; Prevailing wage rates shall be conspicously posted at job site.; required to repair masonry walls, on an on-call, as needed, basis.; safety until permanent repairs are made.; a work schedule to complete repairs.; Upon acceptance of quote, City will authorize permanent repair of damaged wall.; Repair work shall typically be performed between the hours of 8:30 A.; measures, as necessary to ensure public safety until permanent repairs are made.; standard construction/repair practices.; as required to prevent migration of material to gutters or storm drains..

BID WITH CAUTION 16 red flags detected : Back-Charge / Set-Off Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

The City of Sacramento is soliciting bids for on-call masonry wall repair services on an as-needed basis. The contractor will respond to damaged masonry walls within the city, render them safe from falling hazards using temporary measures (barricades, plywood barriers), prepare repair quotes within 48 hours, and execute permanent repairs upon city approval. This is a non-professional services contract for repair/maintenance work in Sacramento, California, subject to prevailing wage requirements (California Labor Code § 1720 et seq.) for work exceeding $15,000. The contract term runs July 1, 2017 through June 30, 2018, with optional extensions through June 30, 2020, with an estimated total value not to exceed $100,000 over three years. Source scope cues include: CITY OF SACRAMENTO Date and; CITY OF SACRAMENTO supply in; planetbids.com/portal/portal; If necessary, the burden of proof and cost of analysis to or replacement.; Sacramento taxes, permits, or fees.; located in the city or unincorporated county of Sacramento.; meets the minimum scope and limits of insurance coverage specified in subsection A, above.; a public works project, using the online PWC-100 form.; PREVAILING WAGE, APPRENTICES, PENALTIES, & CERTIFIED PAYROLL.; Prevailing wage rates shall be conspicously posted at job site.; required to repair masonry walls, on an on-call, as needed, basis.; safety until permanent repairs are made.; a work schedule to complete repairs.; Upon acceptance of quote, City will authorize permanent repair of damaged wall.; Repair work shall typically be performed between the hours of 8:30 A.; measures, as necessary to ensure public safety until permanent repairs are made.; standard construction/repair practices.; as required to prevent migration of material to gutters or storm drains..

Submission deadline

2017-05-17

Red flag teaser

16 red flags detected including Back-Charge / Set-Off Rights.

Locked analysis

Full red flag list with excerpts

16 found

Back-Charge / Set-Off Rights

high

Spillage of earth, gravel, concrete, asphalt, or other materials resulting from hauling operations along or across any public traveled way shall be removed immediately by the Contractor at his expense. If site is not kept sufficiently clean the City will take measures to clean it and back charge the Contractor.

Broad Indemnification

high

…ontract is for specialized legal services if in the best interest of the City. 9. In consideration of the foregoing, I shall defend, indemnify and hold harmless, the City, its officers and employees, against any claims, actions, damages, costs (including reasonable attorney fees), or other liabilities of any kind arising from any violation of the City’s Equal Benefits Requirements or of the Ordin

No Minimum Quantity / Work Guarantee

high

Services will be provided on an as-needed-basis. Services required by the City will be based upon availability of funds and actual needs as they occur throughout the contract period. It is possible that no services may be required by the City from the Contractor during all or any portion of the contract term.

Prevailing Wage / Davis-Bacon

high

The services provided under this contract constitute "public works" under California Labor Code section 1720 et seq. The City of Sacramento is a charter city and has elected to comply the State of California's prevailing wage requirements for all construction work in an amount exceeding $25,000; or alteration, demolition, repair, or maintenance work in an amount exceeding $15,000 (City Code 3.60.180). The contractor awarded this contract and all subcontractors hired will be required to pay not less than the prevailing rates of wages, as determined by the California Department of Industrial Relations, DIR, to all workers employed in the execution of the contract (Labor Code section 1770 et seq.).

Proposal Prices Must Stay Firm for an Extended Period

high

Prices quoted to remain valid throughout term of contract. No price changes are permitted during the term of the contract.

Locked analysis

All deadlines table

5 dates
ItemDue
Bid Submission Deadline 2017-05-17
Contract Effective Date / Project Start 2017-07-01
Initial Contract Period End / Option Period Begins 2018-06-30
Quote Submission Deadline (Per Job) TBD
Emergency Response Time TBD

Locked analysis

Required certifications checklist

22 items
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience
  • Confirm prevailing wage / certified payroll requirements
  • Verify requirement: Commercial General Liability Insurance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all