← Public RFP analyses

On Call General Contracting Services- Facilities Maintenance Division

Source scope cues include: On-Call General Contracting Services Bid Transaction # P19014541003; City of Sacramento; City of Sacramento Standard Specifications; Prevailing Wage and Apprenticeship Requirements. The Department of Public Works is responsible for providing emergency building, buildi; sealed proposal; State Prevailing Wage and Apprenticeship Requirements.; wide scale emergency, firms may be required to provide services and/or equipment.; Name and a number of 24 hours emergency contracts.; enforcement of prevailing wage requirements by the Department of Industrial Relations (DIR).; within this one year warranty period without expense or charge of any nature whatsoever to City.; covered by policy terms or endorsement as additional insureds as respects auto liability.; insurance is canceled or Contractor otherwise ceases to be insured as required herein.; the minimum scope and limits of insurance coverage specified in subsection A, above.; The City reserves the right to change the Scope of Work as necessary..

BID WITH CAUTION 12 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: On-Call General Contracting Services Bid Transaction # P19014541003; City of Sacramento; City of Sacramento Standard Specifications; Prevailing Wage and Apprenticeship Requirements. The Department of Public Works is responsible for providing emergency building, buildi; sealed proposal; State Prevailing Wage and Apprenticeship Requirements.; wide scale emergency, firms may be required to provide services and/or equipment.; Name and a number of 24 hours emergency contracts.; enforcement of prevailing wage requirements by the Department of Industrial Relations (DIR).; within this one year warranty period without expense or charge of any nature whatsoever to City.; covered by policy terms or endorsement as additional insureds as respects auto liability.; insurance is canceled or Contractor otherwise ceases to be insured as required herein.; the minimum scope and limits of insurance coverage specified in subsection A, above.; The City reserves the right to change the Scope of Work as necessary..

Submission deadline

2014-06-20

Red flag teaser

12 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

12 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…d above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, 2

Guaranteed Maximum Price (GMP) / Hard Budget Cap

high

…ween (4) and (6) contractors to be included on the final On-Call List. The contract will be a three-year term contract, in an amount not to exceed $900,000.00. Contractor shall perform with its own organization and with the assistance of workers under its immediate superintendence, work of a value not less than twenty percent (20%) of the value of all Work in the Contract per 2007 City of Sacrame

Liquidated Damages

high

…complete the entire Work by the Completion Date and in the manner provided for in the Contract Documents shall subject Contractor to liquidated damages as provided in this Agreement. Time is and shall be of the essence in the performance of the Contract and the Work. 10. PAYMENTS DO NOT IMPLY ACCEPTANCE OF WORK The payment of any progress payment, or the acceptance thereof by Contractor, shall no

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…Bid Transaction # P19014541003 Issue Date: January 18, 2019 City of Sacramento, Department of Public Works Facilities & Real Property Management, Attn: Kirsten Wise 5730 24th Street, Building 4 Sacramento, CA 95822 PROPOSALS DUE BY 2:00 PM February 20, 2019 A NON-MANDATORY Pre-Proposal Meeting will be held at 10:00am Wednesday, January 30, 2019 at 5730 24th Street, Building 3 Sacramento, CA 95822

Locked analysis

All deadlines table

3 dates
ItemDue
awarding agencies for CMU services provided through 2014-06-20
now limited to: (1) public works projects awarded prior to 2012-01-01
Issue 2019-01-18

Locked analysis

Required certifications checklist

17 items
  • Complete bid/proposal form
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all