North Natoms Library Roof Renewal

Source scope cues include: City of Sacramento Construction Contracting; City of Sacramento is currently; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; planetbids.com/portal/portal.cfm?CompanyID=15300# All such proposal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; Detailed Scope of Work included in the Bid Documents.; demolition, repair, and maintenance project of $15,000 or less.; located" as determined by the Department of Industrial Relations.; threshold for applying prevailing wages?; Yes, if the prevailing wage rate is based on a qualifying craft (i.; or hashtag sign (#) by the applicable prevailing wage rate.; Are these donations subject to prevailing wages?; located, the contractor should use a rate from the nearest geographic area.; Which prevailing wage rate applies?; The applicable prevailing wage rate is for the classification of "Driver - Mixer Trucks.; reaches plant #2, the rate will be the prevailing wage rate for region X.; she returns to plant #1, the driver is entitled to the prevailing wage rate for region Z.; 1791 Tribute Road; 19656 Industrial Avenue, Roseville, CA; 231 Cherry Avenue, Suite.

BID WITH CAUTION 14 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento Construction Contracting; City of Sacramento is currently; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; planetbids.com/portal/portal.cfm?CompanyID=15300# All such proposal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; Detailed Scope of Work included in the Bid Documents.; demolition, repair, and maintenance project of $15,000 or less.; located" as determined by the Department of Industrial Relations.; threshold for applying prevailing wages?; Yes, if the prevailing wage rate is based on a qualifying craft (i.; or hashtag sign (#) by the applicable prevailing wage rate.; Are these donations subject to prevailing wages?; located, the contractor should use a rate from the nearest geographic area.; Which prevailing wage rate applies?; The applicable prevailing wage rate is for the classification of "Driver - Mixer Trucks.; reaches plant #2, the rate will be the prevailing wage rate for region X.; she returns to plant #1, the driver is entitled to the prevailing wage rate for region Z.; 1791 Tribute Road; 19656 Industrial Avenue, Roseville, CA; 231 Cherry Avenue, Suite.

Submission deadline

2012-01-01

Red flag teaser

14 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

14 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arisi

Liquidated Damages

high

…tions at the place where the Work is to be done, is familiar with the Contract Documents and is familiar and expressly agrees to the liquidated damages provision of the Contract Documents. The undersigned has checked carefully all of the foregoing figures and understands that the City of Sacramento will not be responsible for any errors or omissions on the part of the undersigned in making up thi

No Material Substitutions Without Owner Approval

high

…ed LBE fails to perform its contractual obligations. 5. It would be in the best interest of the City. C. Subcontractor Substitution: No substitution of an LBE subcontractor shall be made at any time without compliance with the Subletting and Subcontracting Fair Practices Act. If an LBE subcontractor is unable to perform successfully and is to be replaced, the Contractor shall make reasonable effo

Prevailing Wage / Certified Payroll

high

…sion of Labor Compliance Reports, which became effective May 1, 2007. The contractor and every lower-tier subcontractor shall submit certified payrolls and labor compliance documentation electronically at the discretion of and in the manner specified by the City of Sacramento. Electronic submittal is via a web-based system, accessed on the World Wide Web by a web browser. Each contractor and subc

Locked analysis

All deadlines table

6 dates
ItemDue
to: (1) ongoing public works projects awarded prior to 2012-01-01
or awarded prior to 2016-07-01
contract awarded after 2017-01-01
Project Award 2015-03-09
Updated 2020-01-24
in effect until 2020-01-01

Locked analysis

Required certifications checklist

20 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all