← Public RFP analyses

North 5th Street Sewer Improvement

Source scope cues include: City of Sacramento Bid Opening; City of Sacrame business enterprise; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; an alteration, demolition, repair, and maintenance project of $15,000 or less.; approved in regulations promulgated by the City Department of Utilities.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; is required if a project has multiple building permits associated toit (i.; 06 Proof of Compliance with Contract .; 21 Unsuitable Material, Removal, and Replacement .; documents or other satisfactory proofs as to his compliance with such requirements.; responsible to coordinate utilities relocations within the project area.; adjacent pavement, structures, fences, walls, pipelines, and utilities.; 2812 Meadowview Road, Building.

BID WITH CAUTION 12 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento Bid Opening; City of Sacrame business enterprise; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; an alteration, demolition, repair, and maintenance project of $15,000 or less.; approved in regulations promulgated by the City Department of Utilities.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; is required if a project has multiple building permits associated toit (i.; 06 Proof of Compliance with Contract .; 21 Unsuitable Material, Removal, and Replacement .; documents or other satisfactory proofs as to his compliance with such requirements.; responsible to coordinate utilities relocations within the project area.; adjacent pavement, structures, fences, walls, pipelines, and utilities.; 2812 Meadowview Road, Building.

Submission deadline

Not listed in the public preview.

Red flag teaser

12 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

12 found

Broad Indemnification

high

…Contractor, Contractor shall continue to remain liable to City until all such liabilities are satisfied in full. No failure by City to withhold any payment as specified above shall in any manner be construed to constitute a liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, Form approved by City Attorney 1-11-17

Liquidated Damages

high

…f the work within a period of Eighty-five (85) working days commencing on the date specified in the Notice to Proceed. The amount of liquidated damages to be paid by the Contractor for failure to complete the work by the completion date (as extended, if applicable) shall be One Thousand Five Hundred Dollars ($1,500) for each calendar day, continuing to the time at which the work is completed. Suc

No Material Substitutions Without Owner Approval

high

…supplier fails to perform its contractual obligations. 6. It would be in the best interest of the City. Subcontractor Substitution: No substitution of an LBE subcontractor shall be made at any time without compliance with the Subletting and Subcontracting Fair Practices Act. If an LBE subcontractor is unable to perform successfully and is to be replaced, the Contractor shall make reasonable effor

Prevailing Wage / Certified Payroll

high

…sion of Labor Compliance Reports, which became effective May 1, 2007. The contractor and every lower-tier subcontractor shall submit certified payrolls and labor compliance documentation electronically at the discretion of and in the manner specified by the City of Sacramento. Electronic submittal is via a web-based system, accessed on the World Wide Web by a web browser. Each contractor and subc

Background Check / Drug Testing Requirement

medium

…eptions The Ban-the-Box Ordinance provisions do not apply to: (1) otherwise required by law to conduct a criminal conviction history background check; or (2) a position that -the-Box Ordinance does not prevent nal conviction history background check in subsequent stages of the application process after initially determining whether the applicant meets the minimum employment qualifications. COMPLI

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

20 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all