← Public RFP analyses

North 16th St. Water Main Interconnects and Abandonment

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Sealed Proposals; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; New City Hall, located at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 2:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; is required if a project has multiple building permits associated to it (i.; 10 Proof of Compliance with Contract .; of Utilities, 1395 35th Avenue, Sacramento, California, 95822, phone (916) 808-8889.; documents or other satisfactory proofs as to his compliance with such requirements.; Replacement of lost or damaged material shall be at the Contractor’s expense.; City’s Department of Utilities office located at 1395 35th Avenue.; 2812 Meadowview Road, Building; 1400 Wentworth Ave.

BID WITH CAUTION 15 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento; CITY OF SACRAMENTO Sealed Proposals; bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Si; planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE subcontractor or supplier are unsatisfactory or are not in ac...; New City Hall, located at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 2:00 p.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; entered into in response to a declared emergency.; warranty period without expense or charge of any nature whatsoever to City.; demand all costs and expense of such repair.; such defect, and Contractor shall pay to City on demand all costs and expense of such repair.; otherwise ceases to be insured as required herein.; is required if a project has multiple building permits associated to it (i.; 10 Proof of Compliance with Contract .; of Utilities, 1395 35th Avenue, Sacramento, California, 95822, phone (916) 808-8889.; documents or other satisfactory proofs as to his compliance with such requirements.; Replacement of lost or damaged material shall be at the Contractor’s expense.; City’s Department of Utilities office located at 1395 35th Avenue.; 2812 Meadowview Road, Building; 1400 Wentworth Ave.

Submission deadline

2021-03-04

Red flag teaser

15 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

15 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, Form approved by City

Broad Indemnification

high

…hall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, Form approved by City Attorney 1-11-17

Hazardous Material / Abatement Coordination

high

…o be performed at each end of the abandoned pipe, including intermediate connections, depending on the material of the water main: Asbestos-cement, ductile iron, PVC, cast iron and wrought iron pipe shall be plugged with two (2) feet of concrete. Steel pipe shall be abandoned by either welding 1/4-inch thick steel plate on cut ends or plugging with two (2) feet of concrete. In the event tha

Liquidated Damages

high

…n completion of the work within a period of 45 working days commencing on the date specified in the Notice to Proceed. The amount of liquidated damages to be paid by the Contractor for failure to complete the work by the completion date (as extended, if applicable) shall be One Thousand Dollars ($1,000.00) per working day, continuing to the time at which the work is completed. Such amount is the

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…SPECIFICATIONS FOR NORTH 16TH ST. WATER MAIN INTERCONNECTS AND ABANDONMENT PN: Z14130304 B21141321007 Engineer’s Estimate: $268,000 Mandatory Pre-Bid Site Visit: Thursday, March 4, 2021, 9:00AM Location: Intersection of North B St. and North 17th St. Sacramento, CA For Pre-Bid Information Call: No Separate Plans Bradley Howard Bid to be received before 2:00 p.m. Associate Engineer March 17, 2021…

Locked analysis

All deadlines table

1 dates
ItemDue
Mandatory Pre-Bid Site Visit: Thursday, 2021-03-04

Locked analysis

Required certifications checklist

22 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all