Nichols Park Playground, Shade Structure, and Resilient Surfacing Project

Source scope cues include: City of Riverside; Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; 03 UTILITIES: All known underground utilities are noted on the Plans.; Existing Inactive/Abandoned Utilities: All miscellaneous inactive underground facilities (e.; Erosion Repairs, Guarantees and Warranty Work.; immediate and proper notification of the damage to the utility owner so that repairs can be made.; Contractor shall cooperate with the utility owner and provide access for repair work.; necessary to protect such utilities and structures from damage.; Replacements, Repairs, Guarantees and Warranty Work.; operations shall be repaired by Contractor at Contractor's expense.; material may have a 50% SBR Cryogenic Crumb Rubber and a fiber content of .; ꞏ Replacements, Repairs, Guarantees and Warranty Work..

BID WITH CAUTION 2 red flags detected : No Material Substitutions Without Owner Approval

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside; Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; 03 UTILITIES: All known underground utilities are noted on the Plans.; Existing Inactive/Abandoned Utilities: All miscellaneous inactive underground facilities (e.; Erosion Repairs, Guarantees and Warranty Work.; immediate and proper notification of the damage to the utility owner so that repairs can be made.; Contractor shall cooperate with the utility owner and provide access for repair work.; necessary to protect such utilities and structures from damage.; Replacements, Repairs, Guarantees and Warranty Work.; operations shall be repaired by Contractor at Contractor's expense.; material may have a 50% SBR Cryogenic Crumb Rubber and a fiber content of .; ꞏ Replacements, Repairs, Guarantees and Warranty Work..

Submission deadline

Not listed in the public preview.

Red flag teaser

2 red flags detected including No Material Substitutions Without Owner Approval.

Locked analysis

Full red flag list with excerpts

2 found

No Material Substitutions Without Owner Approval

high

…n of inspection and certification shall be submitted no later than the start of the Final Acceptance Inspection. 1.06 SUBSTITUTIONS: No substitutions will be considered prior to award of the contract. Bid shall be based upon the products specified herein. See also, Special Provisions Section 4-1.6.1 Proposed Substitutions for additional information. 1.07 INSPECTIONS & TESTING: Prior to Final Acce

Sealed Hard-Copy Submission Requirement

medium

…nd title of related Specification Section; and, h) Drawing number and detail references, as appropriate. B. Transmittal: Provide one electronic copy (pdf) of each submittal to the Parks Department Representative using a transmittal form. Submittals received from sources other than Contractor may be returned without action. If a submittal is rejected, submit one copy of the re-submittal. 1.07 SUBM

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

2 items
  • Verify workers compensation coverage
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all