Mills Electrical Upgrades, Stage 2

Source scope cues include: City of Riverside Public Utilities; Bearing and lubrication system design data.; 01730, “Operations and Maintenance Data”.; section, shall be in accordance with Section 01740, “Guarantee and Warranty”.; under any condition of mechanical or hydraulic loading.; mechanical equipment with which the motor is supplied.; mechanical specifications, or as shown on the drawings.; Motors shall be provided with sealed ball bearings lubricated for 10 years continuous use.; premium grade, resistant to attack by moisture, acids, alkalies and mechanical or thermal shock.; Motor leads shall be sealed with a non-wicking, non-hygroscopic insulating material.; explosion proof; motors for areas subject to corrosive gases shall be severe duty.; Explosion proof motors shall have a cast iron frame, cast iron end brackets, cast iron conduit box, 1.; Capacitors shall be dry film or liquid insulated and shall be hermetically sealed in steel enclosures.; or where called for in the detailed mechanical specifications for individual equipment.; Specific motor data such as HP, RPM, enclosure type, etc.; All motors shall have a ground pad located on the same side as the main conduit box.; P&IDs or where called for in the detailed mechanical specifications for individual equipment.; Water Treatment Plant; Houston; Electrical Contractor; electrical contractors.

BID WITH CAUTION 12 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside Public Utilities; Bearing and lubrication system design data.; 01730, “Operations and Maintenance Data”.; section, shall be in accordance with Section 01740, “Guarantee and Warranty”.; under any condition of mechanical or hydraulic loading.; mechanical equipment with which the motor is supplied.; mechanical specifications, or as shown on the drawings.; Motors shall be provided with sealed ball bearings lubricated for 10 years continuous use.; premium grade, resistant to attack by moisture, acids, alkalies and mechanical or thermal shock.; Motor leads shall be sealed with a non-wicking, non-hygroscopic insulating material.; explosion proof; motors for areas subject to corrosive gases shall be severe duty.; Explosion proof motors shall have a cast iron frame, cast iron end brackets, cast iron conduit box, 1.; Capacitors shall be dry film or liquid insulated and shall be hermetically sealed in steel enclosures.; or where called for in the detailed mechanical specifications for individual equipment.; Specific motor data such as HP, RPM, enclosure type, etc.; All motors shall have a ground pad located on the same side as the main conduit box.; P&IDs or where called for in the detailed mechanical specifications for individual equipment.; Water Treatment Plant; Houston; Electrical Contractor; electrical contractors.

Submission deadline

Not listed in the public preview.

Red flag teaser

12 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

12 found

Hazardous Material / Abatement Coordination

high

…Action 24. Inspection 60. Differing or Unusual Site Conditions 25. Examination of Work 61. Hazardous Substance, Hazardous Waste, or Asbestos- 26. Defective Work or Material Related Work 27. Right of Property in Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents a

Liquidated Damages

high

…n Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents and Copyrights 66. Non-Use of Intellectual Property of Third Parties 32. No Payment for Temporary or Preliminary Works 67. Prohibited Relationships with Sanctioned Countries 33. Partial Estimates and Persons 34

No Material Substitutions Without Owner Approval

high

…. Supports data communication to card Readers – 2 or 8 Reader Interface 2. Acceptable unit shall be Johnson Controls P2000 –RDR-2/8; no substitution allowed. E. Software 1. The Contractor shall provide the necessary Johnson Controls and Genetec Camera licenses for all installed devices and cameras. 2.03 SECURITY WORKSTATION A. The minimum workstation requirements if shown on drawings shall be a s

Background Check / Drug Testing Requirement

medium

…respass Completion 50. Character of Workers 14. Termination of Contract for Convenience 51. Employment of Labor 15. Right-of-Way 52. Substance Abuse Policy 16. Obligations of Contractor 53. Safety and Protection 17. Personal Attention 54. Laws and Regulations 18. Protest and Claims Procedure 55. Employment of Indentured Apprentices 19. Contractor's Responsibilities for Losses or Liabilities 56. S

Differing / Unknown Site Conditions (Contractor Risk)

medium

…rawings shall be created in order to document complete system, the 5kV switchgears, master control panel and generator control panel as-is conditions. 5. Design and submit for approval new master control panel, generator control panel 1 and generator control panel 2 per the requirements in Section 16346 and integrating necessary existing auxiliary systems. 6. After approval of new Contractor deve

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

11 items
  • Include payment bond
  • Verify workers compensation coverage
  • Include contractor license information
  • Include references or past project experience
  • Include subcontractor list if required
  • Include safety documents if required
  • Verify requirement: Workers Compensation Insurance
  • Verify requirement: Contractor and Subcontractor Licenses

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all