← Public RFP analyses

Metropolitan Headquarters Building Security Improvements

Source scope cues include: resources for voice and data systems required by the Contract Documents.; switches and the patch cords from the patch panels to the data switches.; distribution frames, conduit, wire, fiber optic cable, terminations, splices, etc.; Supplemental data shall include information as noted in the specification paragraphs requiring them.; Shop drawings and all supporting data, catalogs, etc.; necessary to ensure complete and fully functioning systems within the scope of this project.; repair such work at no cost to Metropolitan.; satisfactory completion of minimum five projects of similar scope and amount.; The entire cable and fiber optic entrance facilities also terminate here.; Four, 4-pair Category 6e jacks that can be used for various services (voice, data, network, etc.; purpose of securing fiber optic cable to the building.; Riser Conduit: Conduit that connects the BDF to the IDF or backboards located on the same or different floors.; MDF, BDF, IDF, and roof telecommunications terminal point.; single purpose, constitutes a copper, data, or network termination field.; optic cable fibers, where all of the cable fibers are used for a single purpose, constitutes a fiber termination field.; from the active data electronic hardware.; Water Treatment Plant; Electrical Contractors.

BID WITH CAUTION 7 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: resources for voice and data systems required by the Contract Documents.; switches and the patch cords from the patch panels to the data switches.; distribution frames, conduit, wire, fiber optic cable, terminations, splices, etc.; Supplemental data shall include information as noted in the specification paragraphs requiring them.; Shop drawings and all supporting data, catalogs, etc.; necessary to ensure complete and fully functioning systems within the scope of this project.; repair such work at no cost to Metropolitan.; satisfactory completion of minimum five projects of similar scope and amount.; The entire cable and fiber optic entrance facilities also terminate here.; Four, 4-pair Category 6e jacks that can be used for various services (voice, data, network, etc.; purpose of securing fiber optic cable to the building.; Riser Conduit: Conduit that connects the BDF to the IDF or backboards located on the same or different floors.; MDF, BDF, IDF, and roof telecommunications terminal point.; single purpose, constitutes a copper, data, or network termination field.; optic cable fibers, where all of the cable fibers are used for a single purpose, constitutes a fiber termination field.; from the active data electronic hardware.; Water Treatment Plant; Electrical Contractors.

Submission deadline

Not listed in the public preview.

Red flag teaser

7 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

7 found

Hazardous Material / Abatement Coordination

high

…Action 24. Inspection 60. Differing or Unusual Site Conditions 25. Examination of Work 61. Hazardous Substance, Hazardous Waste, or Asbestos- 26. Defective Work or Material Related Work 27. Right of Property in Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents a

Liquidated Damages

high

…n Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents and Copyrights 66. Non-Use of Intellectual Property of Third Parties 32. No Payment for Temporary or Preliminary Works 67. Prohibited Relationships with Sanctioned Countries 33. Partial Estimates and Persons 34

Background Check / Drug Testing Requirement

medium

…respass Completion 50. Character of Workers 14. Termination of Contract for Convenience 51. Employment of Labor 15. Right-of-Way 52. Substance Abuse Policy 16. Obligations of Contractor 53. Safety and Protection 17. Personal Attention 54. Laws and Regulations 18. Protest and Claims Procedure 55. Employment of Indentured Apprentices 19. Contractor's Responsibilities for Losses or Liabilities 56. S

Extended Warranty (> 1 Year)

medium

…USB 2.0, 2 3.5mm audio jack, 1 PS/2 Keyboard Port, 1 PS/2 Mouse Port g. USB 101-Key Keyboard h. USB 2-button Mouse w/Scroll Wheel i. 5-year warranty 2. For Headquarters 10th and 12th Floor Offices provide Genetec Model SVW-300-SF3-1050-i7 or equal with the following minimum requirements: a. Processor: Intel Core I7-6700 3.4 GHz Project Spec 17930-11 1938 (construction contract) CONFIDENTIAL METRO

Payment Bond Required

medium

…be Executed by Bidder CONTRACT ADMINISTRATION FORMS 00505 — Agreement 00520 — Escrow Agreement for Security Deposits In Lieu of Retention 00610 — Bond for Faithful Performance 00620 — Payment Bond 00660 — Workers' Compensation Insurance Certification CONDITIONS OF THE CONTRACT 00700 — General Conditions 00800 — Supplementary General Conditions MS December 20, 2018 -1- 1938 (construction contract)

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

10 items
  • Include payment bond
  • Verify workers compensation coverage
  • Include contractor license information
  • Include references or past project experience
  • Include subcontractor list if required
  • Include safety documents if required
  • Verify requirement: Workers Compensation Insurance
  • Verify requirement: Contractor and Subcontractor Licenses

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all