← Public RFP analyses

Metropolitan Headquarters Building Improvements

Source scope cues include: City of Los Angeles Building; City of Los Angeles Fire; bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; sealed proposal; for Faithful Performance” and “Payment Bond,” not in limitation of any warranty, express or implied.; However, the Contractor shall obtain all required permits as specified.; protection contractor licensed by the California Contractors State License Board (C-16).; facilities are located on the first and sixth floors.; The Engineer will designate the locations of the temporary utilities available.; Wall surfaces shall be sealed prior to painting.; Provide extra studs as required to mount electrical or mechanical controls where shown.; shall submit copies of the Material Safety Data Sheets (MSDS) prior to bringing hazardous materials on-site.; uncontaminated areas and still permit emergency exiting.; The Contractor shall also obtain permits and licenses required for conducting its business.; costs for the permits and inspections shall be included in the price entered in the Proposal and Contract sheet.; shall be performed under the terms and conditions of these permits.; plumbing contractor.

BID WITH CAUTION 10 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles Building; City of Los Angeles Fire; bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Pr; sealed proposal; for Faithful Performance” and “Payment Bond,” not in limitation of any warranty, express or implied.; However, the Contractor shall obtain all required permits as specified.; protection contractor licensed by the California Contractors State License Board (C-16).; facilities are located on the first and sixth floors.; The Engineer will designate the locations of the temporary utilities available.; Wall surfaces shall be sealed prior to painting.; Provide extra studs as required to mount electrical or mechanical controls where shown.; shall submit copies of the Material Safety Data Sheets (MSDS) prior to bringing hazardous materials on-site.; uncontaminated areas and still permit emergency exiting.; The Contractor shall also obtain permits and licenses required for conducting its business.; costs for the permits and inspections shall be included in the price entered in the Proposal and Contract sheet.; shall be performed under the terms and conditions of these permits.; plumbing contractor.

Submission deadline

2012-01-05

Red flag teaser

10 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

10 found

Broad Indemnification

high

…tion 995.660. and Health Act (OSHA) and the California Industrial The bonds shall be submitted in the form of “Bond Safety Act. This indemnification is in addition to and for Faithful Performance” and “Payment Bond,” not in limitation of any warranty, express or implied. furnished by Metropolitan, and in amounts each (b) Said duty to defend, indemnify and save equal to 100 percent of the bid. har

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, its cash deposit, certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bi

Prevailing Wage / Certified Payroll

high

…or any inconsistency is the jobsite. The Contractor shall pay not less than discovered in this Contract in relation to any such such prevailing wages to all workers employed on law, ordinances, regulation, or order, the Contractor public work unless the project involves a total shall report the same in writing to Metropolitan's consideration of one thousand dollars ($1000.00) or General Manager o

Bid Bond Required

medium

…r, its cash deposit, certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Proposal. 4. Packaging the Bid -- The bid shall be enclosed in a sealed envelope marked and addresse

Contractor Responsible for All Permits

medium

…nstall. 4. Metropolitan received plan check approval from the City of Los Angeles Building and Safety for this project. However, the Contractor shall obtain all required permits as specified. 1.02 REFERENCES A. Reference specifications and standards: 1. ASTM C36: Standard Specification for Gypsum Wall board. 2. ASTM C475: Standard Specification for Joint Treatment Materials for Gypsum Wallboard C

Locked analysis

All deadlines table

1 dates
ItemDue
inspection scheduled for 10:00 a.m., 2012-01-05

Locked analysis

Required certifications checklist

21 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all