← Public RFP analyses

Metropolitan Delta Properties Flow Meter, Datalogger and Telemetry Installation

Source scope cues include: planetbids.com/portal/portal; will not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; and repair damaged parts of the work.; Wildeye dataloggers and telemetry devices shall be installed by Wildeye approved installer.; 1 = Wildeye Enterprise rechargeable 3G datalogger location.; 1 = Wildeye Enterprise rechargeable 3G datalogger needed.; waterproof, with r/a bracket and 5m cable, SMA on site.; Island / Reclamation District Innovasonic 203 with data logger and telemetry Meter already installed.; #756 1 = Wildeye Enterprise rechargeable 3G datalogger on the meter needed.; The Contractor shall be present during de-watering and shall make adjustment and repairs for any leaks that occur.; valve and ensure flow data is being recorded.; Wildeye datalogger and telemetry systems shall be installed by a Wildeye manufacturer installer.; The Contractor shall coordinate installation of all datalogger and telemetry systems with Wildeye.; The warehouse or storage facilities may be located off the actual site of the work..

BID WITH CAUTION 13 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: planetbids.com/portal/portal; will not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; and repair damaged parts of the work.; Wildeye dataloggers and telemetry devices shall be installed by Wildeye approved installer.; 1 = Wildeye Enterprise rechargeable 3G datalogger location.; 1 = Wildeye Enterprise rechargeable 3G datalogger needed.; waterproof, with r/a bracket and 5m cable, SMA on site.; Island / Reclamation District Innovasonic 203 with data logger and telemetry Meter already installed.; #756 1 = Wildeye Enterprise rechargeable 3G datalogger on the meter needed.; The Contractor shall be present during de-watering and shall make adjustment and repairs for any leaks that occur.; valve and ensure flow data is being recorded.; Wildeye datalogger and telemetry systems shall be installed by a Wildeye manufacturer installer.; The Contractor shall coordinate installation of all datalogger and telemetry systems with Wildeye.; The warehouse or storage facilities may be located off the actual site of the work..

Submission deadline

2021-03-03

Red flag teaser

13 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

13 found

Broad Indemnification

high

…work is to be completed is the essence of the Contract. acceptance of the work by Metropolitan. 15. (a) The Contractor shall defend, indemnify and save 20. By entering into this contract, the Contractor offers harmless Metropolitan, the Board, each member of the Board and agrees to assign to Metropolitan all right, title, interest in and Metropolitan's officers, agents and employees from all and

Hazardous Material / Abatement Coordination

high

…ed – Fall Restraint, Personal Fall Arrest System, Nets, etc. competent person Fall Protection Plan Demolition Demolition Plans Hazardous Materials and Abatement Other Hazardous Wastes Hazardous Waste Management Plan (handling procedures, labeling, transportation and disposal) Welding, Cutting, and Other Hot Work Written Hot Work Permit Electrical Assured Equipment Grounding Conducto

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, its certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bid bond, if fur

Prevailing Wage / Certified Payroll

high

…shall post said copy at the jobsite. The Contractor national laws, county and municipal ordinances and shall pay not less than such prevailing wages to all workers regulations and orders of public bodies that in any manner employed on public work unless the project involves a total affect those engaged or employed in the work, or the materials consideration of one thousand dollars ($1,000.00) or…

Bid Bond Required

medium

…a timely manner, its certified or cashier's check, if furnished, shall be returned to it within 5 days of Contract execution, or the bid bond, if furnished, shall become void. Upon request, the security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of the attached Proposal and Contract. 4. Packaging and Submitting the Bid – Bids shall be prepared fr

Locked analysis

All deadlines table

2 dates
ItemDue
Route 12, Lodi, CA 95242 at 9:00 a.m., 2021-03-03
requirements of Document 00100, Instructions to Bidders, on or before 2:00 p.m., 2021-03-16

Locked analysis

Required certifications checklist

24 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all