McKinley Water Vault Project

Source scope cues include: CITY OF SACRAMENTO; City of Sacramento Standard Specifications; Guaranteed Maximum Price (GMP). Incidental work includes any work not shown on Drawings nor described in Specifications, but which is necessary or normally or customarily requir...; in the GMP or the Contract Time, issued on or after the Effective Date of the Agreement.; a proposed basis for adjustment, if any, in the Contract GMP amount or Contract Time.; expense thereof shall be included in the GMP.; Refers to the City of Sacramento where the Project is located and governed by.; within the scope of the particular duties delegated to them.; the Cost of the Work, an adjustment to the GMP or the Contract Time.; shall be admitted and licensed to do business in the State of California.; A land surveyor licensed in the State of California.; or, in any emergency, suspend the Work.; as a Cost of the Work nor be a basis for an increase in the GMP.; be reimbursed as a Cost of the Work or be a basis for an increase in the GMP.; a) Verification that the subcontractor is properly licensed for the work it will perform.; shall be made for any emergency work that may be required.; Contractor is responsible to repair damages at its own cost.; case damage will be repaired immediately.; electrical contractor.

BID WITH CAUTION 16 red flags detected : Pay-If-Paid Clause

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF SACRAMENTO; City of Sacramento Standard Specifications; Guaranteed Maximum Price (GMP). Incidental work includes any work not shown on Drawings nor described in Specifications, but which is necessary or normally or customarily requir...; in the GMP or the Contract Time, issued on or after the Effective Date of the Agreement.; a proposed basis for adjustment, if any, in the Contract GMP amount or Contract Time.; expense thereof shall be included in the GMP.; Refers to the City of Sacramento where the Project is located and governed by.; within the scope of the particular duties delegated to them.; the Cost of the Work, an adjustment to the GMP or the Contract Time.; shall be admitted and licensed to do business in the State of California.; A land surveyor licensed in the State of California.; or, in any emergency, suspend the Work.; as a Cost of the Work nor be a basis for an increase in the GMP.; be reimbursed as a Cost of the Work or be a basis for an increase in the GMP.; a) Verification that the subcontractor is properly licensed for the work it will perform.; shall be made for any emergency work that may be required.; Contractor is responsible to repair damages at its own cost.; case damage will be repaired immediately.; electrical contractor.

Submission deadline

2020-01-01

Red flag teaser

16 red flags detected including Pay-If-Paid Clause.

Locked analysis

Full red flag list with excerpts

16 found

Pay-If-Paid Clause

critical

…ment shall be made for compensable delays which occur during a concurrent delay as defined in Article 9.3.5, Concurrent Delays. As a condition precedent to payment for field overhead and indirect home office overhead, the Contractor must fulfill all conditions as provided in Article 9.4.2, Excusable or Compensable Delays. Compensation will be calculated in accordance with 9.4.3.1 and 9.4.3.2, bel

Broad Indemnification

high

…State of California. Herein. Refers to information presented in the Contract Documents. Hold Harmless. An agreement by one party to indemnify and defend a second party when the second party is sued by a third party as a result of the first party’s actions or inactions. Holidays. The legal holidays as designated by the City including: New Year’s Day, Martin Luther King Jr. Day, President's Day, Ce

Guaranteed Maximum Price (GMP) / Hard Budget Cap

high

…by an authorized representative of the City, which authorizes an addition, deletion, or revision in the Work or an adjustment in the GMP or the Contract Time, issued on or after the Effective Date of the Agreement. City. The word “City” refers to the City of Sacramento, the governing body of which is termed the “City Council”. The City may sometimes be referred to as “Owner”. Claim. A demand or a

Hazardous Material / Abatement Coordination

high

…g Contractor’s entitlement to payments, the requirements of which are more fully described in Article 12.3, Application for Payment. Asbestos. Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. Bid Proposal (RFBD). The offer

Lien Waiver / Waiver of Lien Rights

high

…tors of any tier, and material suppliers covering the progress payment or final payment requested; (iii) duly completed and executed Unconditional Waiver and Release Upon Progress Payment forms in accordance with California Civil Code §§ 8134 and 8138 for all subcontractors of any tier, and material suppliers covering the progress payment received by the Contractor under the prior progress paymen

Locked analysis

All deadlines table

1 dates
ItemDue
(i) This section shall remain in effect only until 2020-01-01

Locked analysis

Required certifications checklist

18 items
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all