← Public RFP analyses

Martin Luther King Jr. Library-ADA Parking Lot Improvements

Source scope cues include: City of Sacramento Construction Contracting; City of Sacramento is currently; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; planetbids.com/portal/portal.cfm?CompanyID=15300# All such proposal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; Detailed Scope of Work included in the Bid Documents.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; located" as determined by the Department of Industrial Relations.; threshold for applying prevailing wages?; Yes, if the prevailing wage rate is based on a qualifying craft (i.; 1791 Tribute Road; 19656 Industrial Avenue, Roseville, CA; 231 Cherry Avenue, Suite; Mechanical Contractors; Electrical Contractors.

BID WITH CAUTION 17 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento Construction Contracting; City of Sacramento is currently; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; planetbids.com/portal/portal.cfm?CompanyID=15300# All such proposal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; Detailed Scope of Work included in the Bid Documents.; an alteration, demolition, repair, and maintenance project of $15,000 or less.; located" as determined by the Department of Industrial Relations.; threshold for applying prevailing wages?; Yes, if the prevailing wage rate is based on a qualifying craft (i.; 1791 Tribute Road; 19656 Industrial Avenue, Roseville, CA; 231 Cherry Avenue, Suite; Mechanical Contractors; Electrical Contractors.

Submission deadline

2012-01-01

Red flag teaser

17 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

17 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arisi

Hazardous Material / Abatement Coordination

high

…n equal shall be as defined in Section 01630. C. Contractor shall certify that each product submitted as an equal is consid- ered as asbestos free in accordance with all applicable regulations of Federal, State and Local Authorities and Regulatory Agencies. 2.10 PRE-APPROVAL OF EQUALS A. Only those items, materials, equipment, methods or processes identified as "or equal", "approved equal" or "or

Lien Waiver / Waiver of Lien Rights

high

…s (AIA Documents G706A or similar form approved by the Engineer/Owner and Owner) including the following: a. Contractor's Release or Waiver of Liens. b. Separate releases or Waivers of Lien for each Subcontractor, supplier, and others with lien rights against Owner's property, together with list of those parties. B. Duly sign and execute all submittals, before delivery to Engineer/Owner. 1.11 FIN

Liquidated Damages

high

…tions at the place where the Work is to be done, is familiar with the Contract Documents and is familiar and expressly agrees to the liquidated damages provision of the Contract Documents. The undersigned has checked carefully all of the foregoing figures and understands that the City of Sacramento will not be responsible for any errors or omissions on the part of the undersigned in making up thi

Locked analysis

All deadlines table

6 dates
ItemDue
to: (1) ongoing public works projects awarded prior to 2012-01-01
or awarded prior to 2016-07-01
contract awarded after 2017-01-01
Project Award 2015-03-09
Updated 2018-08-14
in effect until 2020-01-01

Locked analysis

Required certifications checklist

22 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all