MAINTENANCE AND REPAIR OF CURBS, GUTTERS, SIDEWALKS, AND RELATED ITEMS

Source scope cues include: MAINTENANCE AND REPAIR OF CURBS,; City of Sacramento; City of Sacramento MUTCD; sealed proposal; is solici ng bids to: Provide maintenance and repair of curbs, guters, sidewalks, and related items.; related items located throughout the City of Sacramento.; Side Forms and Headers, and Section 24 – Curb, Gutter, Sidewalks, and Gutter Drains.; Doweling is required on all sidewalk, curb, and gutter projects.; burden of proof of an incorrect billing shall be on the Contractor.; completion of the excavation activities prior to the invoice being submitted.; Only emergency repairs will be permitted during this holiday period.; damage through the excavation or replacement work of the project.; be cemented flush with the surface of the concrete gutter, and/or curb.; unto the public right-of-way and gutters.; remove the curb, gutter, and/or sidewalk.; concrete has been poured on new curb and gutter.; All Contractors who submit bids on a public works project must be properly licensed.; prevailing wage rates as ascertained from time to time which shall be applicable to this project.; which the factory or batching plant is located..

BID WITH CAUTION 11 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: MAINTENANCE AND REPAIR OF CURBS,; City of Sacramento; City of Sacramento MUTCD; sealed proposal; is solici ng bids to: Provide maintenance and repair of curbs, guters, sidewalks, and related items.; related items located throughout the City of Sacramento.; Side Forms and Headers, and Section 24 – Curb, Gutter, Sidewalks, and Gutter Drains.; Doweling is required on all sidewalk, curb, and gutter projects.; burden of proof of an incorrect billing shall be on the Contractor.; completion of the excavation activities prior to the invoice being submitted.; Only emergency repairs will be permitted during this holiday period.; damage through the excavation or replacement work of the project.; be cemented flush with the surface of the concrete gutter, and/or curb.; unto the public right-of-way and gutters.; remove the curb, gutter, and/or sidewalk.; concrete has been poured on new curb and gutter.; All Contractors who submit bids on a public works project must be properly licensed.; prevailing wage rates as ascertained from time to time which shall be applicable to this project.; which the factory or batching plant is located..

Submission deadline

2025-06-02

Red flag teaser

11 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

11 found

Broad Indemnification

high

…ver or exemp on. The City shall determine in its sole discre on whether to approve any such request. 8. Contractor agrees to defend, indemnify and hold harmless, the City, its officers and employees, against any claims, ac ons, damages, costs (including reasonable atorney fees), or other liabili es of any kind arising from any viola on of the Requirements or of the Ordinance by Contractor. The un

Liquidated Damages

high

…ernment construction contracts in Sacramento County within the last five years: Within those five years, has your firm been assessed liquidated damages on three or more government construction contracts in Sacramento County for failure to complete contract work on time? NOTE: If there is a pending administrative or court action challenging the assessment of liquidated damages on a government cont

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…ONFERENCE MEETING No Yes, attendance is optional -OR- Yes, attendance is MANDATORY NOTE: Bids from bidders who do not attend a MANDATORY pre-bid meeting shall be deemed non-responsive. Date: Time: Location site name: Address: Bldg./Floor/Room: City: Link for virtual meeting: PUBLIC BID OPENING Yes No Public Bid Openings will be held as soon as prac cable a er the submission deadline. Pr

Prevailing Wage / Certified Payroll

high

…2014, and became effective immediately, made several significant changes to laws pertaining to the administration and enforcement of prevailing wage requirements by the Department of Industrial Relations (DIR). Among other things, SB 854 established a new public works contractor registration program to replace prior Compliance Monitoring Unit (CMU) and Labor Compliance Program (LCP) requirements

Project Labor Agreement / Union Requirements

high

…ration and enforcement of public works requirements: Requirements to use CMU or specified alternative (labor compliance program or project labor agreement) for state bond-funded and other specified projects have been eliminated and replaced by requirements that apply to all public works projects (as defined under the Labor Code). Awarding bodies are now required to submit PWC-100 (contract aw

Locked analysis

All deadlines table

6 dates
ItemDue
Estimated Week of Award Notification: Week of 2025-06-02
Estimated Week of Contract Award: Week of 2025-07-01
awarding agencies for CMU services provided through 2014-06-20
now limited to: (1) public works projects awarded prior to 2012-01-01
Questions due by 2025-04-16
Bid Due By 2025-04-23

Locked analysis

Required certifications checklist

19 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Confirm mandatory pre-bid meeting or site visit attendance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all