← Public RFP analyses

Land Park Mow Strip and Jogging Path Phase 4

Source scope cues include: CITY OF SACRAMENTO SEALED PROPOSALS; City of Sacramento; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; PlanetBids”) Q&A tab for this bid. http://www.planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; The City’s Bid Center (“PlanetBids”) Q&A tab for this bid.; demolition, repair, or maintenance work in an amount exceeding $15,000.; Prevailing Wages: The provisions of Sacramento City Code Section 3.; which it has been designed, improved, constructed, altered, or repaired.; h:\documents\contract mgmt\oki lap pool liner replacement\contract docs\_planet bids\16-drug free.; shall pay to City on demand all costs and expense of such repair.; demand all costs and expense of such repair.; repairs that may be required as determined in the sole discretion and judgment of City.; insureds as respects auto liability..

BID WITH CAUTION 13 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF SACRAMENTO SEALED PROPOSALS; City of Sacramento; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; PlanetBids”) Q&A tab for this bid. http://www.planetbids.com/portal/portal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; The City’s Bid Center (“PlanetBids”) Q&A tab for this bid.; demolition, repair, or maintenance work in an amount exceeding $15,000.; Prevailing Wages: The provisions of Sacramento City Code Section 3.; which it has been designed, improved, constructed, altered, or repaired.; h:\documents\contract mgmt\oki lap pool liner replacement\contract docs\_planet bids\16-drug free.; shall pay to City on demand all costs and expense of such repair.; demand all costs and expense of such repair.; repairs that may be required as determined in the sole discretion and judgment of City.; insureds as respects auto liability..

Submission deadline

2014-06-20

Red flag teaser

13 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

13 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…ontract is for specialized legal services if in the best interest of the City. 8. In consideration of the foregoing, I shall defend, indemnify and hold harmless, the City, its officers and employees, against any claims, actions, damages, costs (including reasonable attorney fees), or other liabilities of any kind arising from any violation of the Requirements or of the Ordinance by me. Attachment

Liquidated Damages

high

…al conditions at the place where the Work is to be done, has read and understood the Contract Documents, and expressly agrees to the liquidated damages provision in the Contract Documents. The undersigned has checked carefully all of the figures in its Bid Proposal and understands and agrees that the City of Sacramento will not be responsible for any errors or omissions on the part of the undersi

No Material Substitutions Without Owner Approval

high

…ed LBE fails to perform its contractual obligations. 5. It would be in the best interest of the City. C. Subcontractor Substitution: No substitution of an LBE subcontractor shall be made at any time without compliance with the Subletting and Subcontracting Fair Practices Act. If an LBE subcontractor is unable to perform successfully and is to be replaced, the Contractor shall make reasonable effo

Prevailing Wage / Certified Payroll

high

…bmission of Labor Compliance Reports, which became effective May 1, 2007. Each contractor and every lower-tier subcontractor submits certified payrolls and labor compliance documentation electronically at the discretion of and in the manner specified by the City of Sacramento. Electronic submittal is via a web-based system, accessed on the World Wide Web by a web browser. Each contractor and subc

Locked analysis

All deadlines table

5 dates
ItemDue
awarding agencies for CMU services provided through 2014-06-20
now limited to: (1) public works projects awarded prior to 2012-01-01
contract awarded after 2017-01-01
due of 2019-02-27
in effect until 2020-01-01

Locked analysis

Required certifications checklist

21 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all