← Public RFP analyses

Lake Mathews Power Plant Powerhouse Repair

Source scope cues include: City of Los Angeles Bureau; City of Los Angeles; sealed proposal; Plant Powerhouse Repair located in Riverside, CA, in accordance with Specifications No.; deck, pavement replacement, and all appurtenant work as specified and shown on the drawings.; Facility located at 18250 La Sierra Avenue, Riverside, California, 92503 at 10:00 a.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; less than the prevailing wage rate shall be paid to each worker by the Contractor.; Electrical Contractors; plumbing contractor.

BID WITH CAUTION 18 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles Bureau; City of Los Angeles; sealed proposal; Plant Powerhouse Repair located in Riverside, CA, in accordance with Specifications No.; deck, pavement replacement, and all appurtenant work as specified and shown on the drawings.; Facility located at 18250 La Sierra Avenue, Riverside, California, 92503 at 10:00 a.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; less than the prevailing wage rate shall be paid to each worker by the Contractor.; Electrical Contractors; plumbing contractor.

Submission deadline

Not listed in the public preview.

Red flag teaser

18 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

18 found

Broad Indemnification

high

…from all claims of any kind arising directly or indirectly out of the performance of the work. (f) Indemnity. — The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind which may arise from or in connection with MWD Standard Document 00700-12 MS October 14, 2016

Hazardous Material / Abatement Coordination

high

…ination of Work 60. Differing or Unusual Site Conditions 26. Defective Work or Material 61. Hazardous Substance, Hazardous Waste, or Asbestos- 27. Right of Property in Materials Related Work 28. Title to Materials Found on the Work 62. Hazardous Material 29. Access to Work 63. Hazardous Waste 30. Liquidated Damages 64. Insurance 31. Patents and Copyrights 65. Payrolls and Records 32. No Payment f

Liquidated Damages

high

…in Materials Related Work 28. Title to Materials Found on the Work 62. Hazardous Material 29. Access to Work 63. Hazardous Waste 30. Liquidated Damages 64. Insurance 31. Patents and Copyrights 65. Payrolls and Records 32. No Payment for Temporary or Preliminary Works 66. Non-Use of Intellectual Property of Third Parties 33. Partial Estimates 67. Prohibited Relationships with Sanctioned Countries

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records it is requ

Project Labor Agreement / Union Requirements

high

…but not limited to, compensation insurance, and social security payments. (3) The amount paid for subsistence and travel required by collective bargaining agreements, or in accordance with the regular practice of the employer. At the beginning of the Contract and as later requested by the Engineer, the Contractor shall furnish the Engineer proof of labor compensation rates being paid or paid. (e)

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

22 items
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include W-9 or taxpayer information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all