← Public RFP analyses

Kitchen Remodel at DOU Administration Building

Source scope cues include: City of Sacramento Construction Contracting; City of Sacramento is currently; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; planetbids.com/portal/portal.cfm?CompanyID=15300# All such proposal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; Detailed Scope of Work included in the Bid Documents.; drilling at existing concrete roof and setting aside upper cabinets for reuse.; Following construction, the floors are to be cleaned and the grout sealed.; demolition, repair, and maintenance project of $15,000 or less.; located" as determined by the Department of Industrial Relations.; threshold for applying prevailing wages?; 1791 Tribute Road; 19656 Industrial Avenue, Roseville, CA; 231 Cherry Avenue, Suite; Mechanical Contractors; Electrical Contractors.

BID WITH CAUTION 16 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Sacramento Construction Contracting; City of Sacramento is currently; bid bond made payable to the order of the City of Sacramento in the Sum of ten percent (10%) of the aggregate of said proposal. The right to reject any and all bids or; planetbids.com/portal/portal.cfm?CompanyID=15300# All such proposal; bond requirements of the Contractor. 4. The work performed or the materials or equipment provided by the listed LBE are unsatisfactory or are not in accordance with the plans an...; Detailed Scope of Work included in the Bid Documents.; drilling at existing concrete roof and setting aside upper cabinets for reuse.; Following construction, the floors are to be cleaned and the grout sealed.; demolition, repair, and maintenance project of $15,000 or less.; located" as determined by the Department of Industrial Relations.; threshold for applying prevailing wages?; 1791 Tribute Road; 19656 Industrial Avenue, Roseville, CA; 231 Cherry Avenue, Suite; Mechanical Contractors; Electrical Contractors.

Submission deadline

2012-01-01

Red flag teaser

16 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

16 found

Back-Charge / Setoff Rights

high

…specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabil

Broad Indemnification

high

…City’s right to withhold payment for such liabilities. 16. INDEMNITY AND HOLD HARMLESS A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arisi

Hazardous Material / Abatement Coordination

high

…e. Provide and install: a temporary construction barrier with 6‐mil plastic, tile, exhaust hood and duct through the roof (including asbestos abatement at roof penetration), electrical receptacles, new wood cabinets and doors to match, paint, gypsum board finish and insulation, reinstall upper cabinets as storage, and finishes as called out on plans. Following construction, the floors are to be c

Lien Waiver / Waiver of Lien Rights

high

…or's Affidavit of Release of Liens (AIA Documents G706A or similar form approved by the Owner) including: a. Contractor's Release or Waiver of Liens. b. Separate releases or Waivers of Lien for each Subcontractor, supplier, and others with lien rights against Owner's property, together with list of those parties. B. Duly sign and execute all submittals, before delivery to Owner. 1.11 FINAL ADJUST

Liquidated Damages

high

…tions at the place where the Work is to be done, is familiar with the Contract Documents and is familiar and expressly agrees to the liquidated damages provision of the Contract Documents. The undersigned has checked carefully all of the foregoing figures and understands that the City of Sacramento will not be responsible for any errors or omissions on the part of the undersigned in making up thi

Locked analysis

All deadlines table

6 dates
ItemDue
to: (1) ongoing public works projects awarded prior to 2012-01-01
or awarded prior to 2016-07-01
contract awarded after 2017-01-01
Project Award 2015-03-09
Updated 2019-04-05
in effect until 2020-01-01

Locked analysis

Required certifications checklist

22 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all