← Public RFP analyses

Julian Hinds Pumping Plant Renovation of Houses 42 and 149

Source scope cues include: Mastic, gray Covering HVAC duct seams in Utility Closet.; 149, located at the Julian Hinds Pumping Plant, Riverside County, California.; composed of composite asphalt sheeting underlying roof shingles.; determining asbestos fibers in bulk samples.; airborne fiber concentrations as determined by phase contrast microscopy (PCM).; must conduct any demolition and/or renovation work exceeding 100 square feet.; * Negative floor tile samples may contain significant amounts (>1%) of very thin asbestos fibers which cannot be detected by PLM.; “* Negative floor tile sampies may contain significant amounts {>1%} of very thin asbestos fibers which cannot be detected by PLM.; ** Negative floor tile samples may contain significant amounts {>1%)} of very thin asbestos fibers which cannot be detected by PLM.; “+ Negative floor tlle samples may contain significant amounts (>1%) of very thin asbestes fibers which cannot be detected by PLM.; ** Negative floor tile samples may contain significant amounts (>1%) of very thin asbestos fibers which cannot be detected by PLM.; analyzed as calculated from the data presented with those samples.; analytical quality control data meet the requirement of the procedure, unless otherwise indicated.; Photograph 4: Asbestos-containing floortile and black mastic located throughout residence.; 1% TEM) located on all interior walls of residence.; Photograph 6: Gray mastic (< 1% TEM) located on seams of HVAC Unit..

BID WITH CAUTION 2 red flags detected : Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Mastic, gray Covering HVAC duct seams in Utility Closet.; 149, located at the Julian Hinds Pumping Plant, Riverside County, California.; composed of composite asphalt sheeting underlying roof shingles.; determining asbestos fibers in bulk samples.; airborne fiber concentrations as determined by phase contrast microscopy (PCM).; must conduct any demolition and/or renovation work exceeding 100 square feet.; * Negative floor tile samples may contain significant amounts (>1%) of very thin asbestos fibers which cannot be detected by PLM.; “* Negative floor tile sampies may contain significant amounts {>1%} of very thin asbestos fibers which cannot be detected by PLM.; ** Negative floor tile samples may contain significant amounts {>1%)} of very thin asbestos fibers which cannot be detected by PLM.; “+ Negative floor tlle samples may contain significant amounts (>1%) of very thin asbestes fibers which cannot be detected by PLM.; ** Negative floor tile samples may contain significant amounts (>1%) of very thin asbestos fibers which cannot be detected by PLM.; analyzed as calculated from the data presented with those samples.; analytical quality control data meet the requirement of the procedure, unless otherwise indicated.; Photograph 4: Asbestos-containing floortile and black mastic located throughout residence.; 1% TEM) located on all interior walls of residence.; Photograph 6: Gray mastic (< 1% TEM) located on seams of HVAC Unit..

Submission deadline

2009-08-04

Red flag teaser

2 red flags detected including Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200).

Locked analysis

Full red flag list with excerpts

2 found

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

The Housing and Urban Development (HUD) has established 0.5% lead by weight as the guideline for lead abatement actions on paints found to be in poor condition. The guidelines, updated in June 1995, are widely recognized as the best available guidance to date on proper abatement of lead-based paint. HUD, however, is considering lowering this guideline from 0.5% to 0.06% lead by weight to be consis

Hazardous Material / Abatement Coordination

high

Asbestos and Lead Bulk Sampling

Locked analysis

All deadlines table

3 dates
ItemDue
Analyzed 2009-08-04
Sampled 2009-07-31
of Analysis 2009-08-03

Locked analysis

Required certifications checklist

1 items
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →