← Public RFP analyses

Joseph P. Jensen and Robert A. Skinner Water Treatment Plants Battery Energy Storage Systems

Source scope cues include: City of Los Angeles Fire; City of Los Angeles; N-1 The Metropolitan Water District of Southern California hereby invites sealed bids for the Joseph P.; (SGIP) administered by the California Public Utilities Commission.; Jensen is located at 13100 Balboa Blvd.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; to the proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; paid less than the prevailing wage rate shall be paid to each worker by the Contractor.; Water Treatment Plant; Mechanical Contractors; Electrical Contractors.

BID WITH CAUTION 19 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles Fire; City of Los Angeles; N-1 The Metropolitan Water District of Southern California hereby invites sealed bids for the Joseph P.; (SGIP) administered by the California Public Utilities Commission.; Jensen is located at 13100 Balboa Blvd.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; to the proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; paid less than the prevailing wage rate shall be paid to each worker by the Contractor.; Water Treatment Plant; Mechanical Contractors; Electrical Contractors.

Submission deadline

2021-06-23

Red flag teaser

19 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

19 found

Broad Indemnification

high

…from all claims of any kind arising directly or indirectly out of the performance of the work. (f) Indemnity. — The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind which may arise from or in connection with the performance of the work and the results of tha

Hazardous Material / Abatement Coordination

high

…Action 24. Inspection 60. Differing or Unusual Site Conditions 25. Examination of Work 61. Hazardous Substance, Hazardous Waste, or Asbestos- 26. Defective Work or Material Related Work 27. Right of Property in Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents a

Liquidated Damages

high

…n Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents and Copyrights 66. Non-Use of Intellectual Property of Third Parties 32. No Payment for Temporary or Preliminary Works 67. Prohibited Relationships with Sanctioned Countries 33. Partial Estimates and Persons 34

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records he or she

Project Labor Agreement / Union Requirements

high

…but not limited to, compensation insurance, and social security payments. (3) The amount paid for subsistence and travel required by collective bargaining agreements, or in accordance with the regular practice of the employer. At the beginning of the Contract and as later requested by the Engineer, the Contractor shall furnish the Engineer proof of labor compensation rates being paid or paid. (e)

Locked analysis

All deadlines table

1 dates
ItemDue
Water Treatment Plant, 33740 Borel Road, Winchester, CA 92596 at 8:00 a.m. on 2021-06-23

Locked analysis

Required certifications checklist

24 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all