Joseph Jensen Water Treatment Plant Ozone Power Supply Units Replacement

Source scope cues include: or time, or both, and all other pertinent factual data.; it, with additional data or information within 10 calendar days after service thereof on the General Manager.; (c) All invoices covering shipments where prices are named f.; APPLICABLE LAW – LATER THAN FIVE (5) MONTHS AFTER EXPIRATION OF SUCH WARRANTY PERIOD.; warranty, Contractor shall, at its option, repair or replace the defective part or parts, f.; access, removal, installation, temporary power or any other expenses that may be incurred with repair or replacement.; The warranty shall cover all parts, lab or and services to correct the defect.; Refer to Section 01740, Guarantee and Warranty, for additional req uirements.; services for replacement of failed components.; Equipment System (within the power vessel), which occurs following the end of the warranty period.; Equipment System (in the generator vessel), which occurs following the end of the warranty period.; System (within the power supply unit), which occurs following the end of the warranty period.; Equipment System (within the power supply unit), which occurs following the end of the warranty period.; Delivery Storage and Handling Product Data, Test Reports and Certifications per Section 01610.; Nameplate and Packaging Product Data and Shipping Paperwork per Section 01611.; Data, Design Drawings and Procedures per Sections 01340 and 13290.; Water Treatment Plant.

BID WITH CAUTION 6 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: or time, or both, and all other pertinent factual data.; it, with additional data or information within 10 calendar days after service thereof on the General Manager.; (c) All invoices covering shipments where prices are named f.; APPLICABLE LAW – LATER THAN FIVE (5) MONTHS AFTER EXPIRATION OF SUCH WARRANTY PERIOD.; warranty, Contractor shall, at its option, repair or replace the defective part or parts, f.; access, removal, installation, temporary power or any other expenses that may be incurred with repair or replacement.; The warranty shall cover all parts, lab or and services to correct the defect.; Refer to Section 01740, Guarantee and Warranty, for additional req uirements.; services for replacement of failed components.; Equipment System (within the power vessel), which occurs following the end of the warranty period.; Equipment System (in the generator vessel), which occurs following the end of the warranty period.; System (within the power supply unit), which occurs following the end of the warranty period.; Equipment System (within the power supply unit), which occurs following the end of the warranty period.; Delivery Storage and Handling Product Data, Test Reports and Certifications per Section 01610.; Nameplate and Packaging Product Data and Shipping Paperwork per Section 01611.; Data, Design Drawings and Procedures per Sections 01340 and 13290.; Water Treatment Plant.

Submission deadline

2020-02-11

Red flag teaser

6 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

6 found

Broad Indemnification

high

…be made and become effective at the time Metropolitan tenders final payment to the bidder. 27. Indemnity. — (a) The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind, arising out of or in connection with work to be performed, including but not limited to: (1)

Liquidated Damages

high

…re 6. Assignment Forbidden 21. Shipment 7. Suspension of Contract 22. Payment 8. Additional Surety 23. Sales and Use Taxes 9. Delays-Liquidated Damages 24. Moneys May Be Retained 10. Authority of the Engineer 25. Federal Law and Regulations 11. Changes 26. Assignment of Causes of Action 12. Extra Work 27. Indemnity 13. Contractor’s Obligations 28. Limitations on Liability 14. Responsibility for A

Differing / Unknown Site Conditions (Contractor Risk)

medium

…t, such changes shall be ordered and paid for as extras, as hereinafter provided in Article 12. (c) If the Contractor, on account of unforeseen conditions, finds it impracticable to comply strictly with these specifications, and applies in writing for a modification of the designs or requirements, such change may be authorized by the Engineer if not detrimental to the product and without extra co

High Insurance Limits Required

medium

(b) The general liability coverage shall be $1,000,000. (c) Auto insurance coverage shall be in the amount of $1,000,000 combined single limit. (d) If required, the Contractor shall provide workers’ compensation insurance that is in accordance with State of California statutory requirements and shall include Employer’s Liability coverage of $1,000,000 per accident for bodily injury or disease. The

Performance Bond Required

medium

…justment of accounts made. 8. Additional surety. — If, during the continuance of the contract, any of the sureties upon the faithful performance bond, in the opinion of the Engineer, are or become insufficient, he may require additional sufficient sureties which the Contractor shall furnish to the satisfaction of the Engineer within 15 calendar days after written notice, and in default thereof th

Locked analysis

All deadlines table

2 dates
ItemDue
Awarded 2020-02-11
Project Start 2009-11-18

Locked analysis

Required certifications checklist

8 items
  • Include performance bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include references or past project experience
  • Verify requirement: Commercial General Liability Insurance
  • Resolve before bid: High Insurance Limits Required
  • Resolve before bid: Performance Bond Required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all