Source scope cues include: Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; Replacements, Repairs, Guarantees and Warranty Work.; specifications and a replacement parts lists for all equipment proposed for the Project.; Protect all metal products with adequate waterproof outer wrappings.; 04 PROTECTION AND REPAIR: Protect all wood doors from damage during the subsequent construction activities.; Park Projects Inspector for City's ongoing maintenance and replacement of the ceramic tiles.; 09 REPLACEMENT: Replace cracked, chipped, broken, and otherwise defective tiles.; and other data required to demonstrate compliance with the specified requirements.; each color and finish, in new, sealed, unopened containers.; specifications and a replacement parts list for all equipment proposed for the Project.; filled with a non-corrosive material and waterproofed.; roofing felt to serve as an expansion felt to a thickness of 1/8 inch.; system in accordance with the standards of the Public Utilities Department.; Codes; the Uniform Mechanical Code Vol..

BID WITH CAUTION 5 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; Replacements, Repairs, Guarantees and Warranty Work.; specifications and a replacement parts lists for all equipment proposed for the Project.; Protect all metal products with adequate waterproof outer wrappings.; 04 PROTECTION AND REPAIR: Protect all wood doors from damage during the subsequent construction activities.; Park Projects Inspector for City's ongoing maintenance and replacement of the ceramic tiles.; 09 REPLACEMENT: Replace cracked, chipped, broken, and otherwise defective tiles.; and other data required to demonstrate compliance with the specified requirements.; each color and finish, in new, sealed, unopened containers.; specifications and a replacement parts list for all equipment proposed for the Project.; filled with a non-corrosive material and waterproofed.; roofing felt to serve as an expansion felt to a thickness of 1/8 inch.; system in accordance with the standards of the Public Utilities Department.; Codes; the Uniform Mechanical Code Vol..

Submission deadline

Not listed in the public preview.

Red flag teaser

5 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

5 found

Hazardous Material / Abatement Coordination

high

…g and undue weathering for a period of two (2) years after Final Acceptance of the Project. PART 2 - MATERIALS 2.01 PAINT MATERIALS: LEAD BASED PAINTS SHALL NOT BE USED A. Standard Specifications: All materials shall conform with Standard Specifications Section 210 PAINT AND PROTECTIVE COATINGS except as modified herein. The paint products listed hereinafter by name or number are taken from the c

Contractor Responsible for All Permits

medium

…jurisdiction over this Project. Nothing in the Plans or Specifications is to be construed to permit work not conforming to codes. B. Contractor shall obtain all permits, patent rights, and licenses that are required for the performing of this Work by all laws, ordinances, rules and regulations, or orders of any lawfully authorized officer and/or applicable regulatory body. Contractor shall give a

Sealed Hard-Copy Submission Requirement

medium

…nd title of related Specification Section; and, h) Drawing number and detail references, as appropriate. B. Transmittal: Provide one electronic copy (pdf) of each submittal to the Parks Department Representative using a transmittal form. Submittals received from sources other than Contractor may be returned without action. If a submittal is rejected, submit one copy of the re-submittal. 1.07 SUBM

Warranty for Contract Duration / No-Charge Corrections

medium

…The Work of this Section shall be guaranteed against all defects in materials and workmanship for a period of one (1) year. Any such defect found within the guarantee period shall be repaired or replaced to the satisfaction of, and at no additional cost to City. 1.05 SUBMITTALS: Submit copies of each of the following per Special Provisions Section 2-5.3 Shop Drawings and Submittals and Technical

Owner Right to Reject All Bids

low

…ith the same characteristics may be submitted at the preconstruction conference for Parks Department Representative's approval. City reserves the right to reject any substitutions. C. Approval Prior to Ordering Materials: All material lists, Shop Drawings, and product cut sheets must be approved by the Parks Department Representative before Contractor orders materials or commences with rough-in w

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

4 items
  • Verify workers compensation coverage
  • Include references or past project experience
  • Include safety documents if required
  • Resolve before bid: Contractor Responsible for All Permits

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all