Iron Mountain Pumping Plant Operation and Maintenance Building Demolition and Abatement

Source scope cues include: planetbids.com/portal/portal; will not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; and repair damaged parts of the work.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; Work shall be performed under the terms and conditions of these permits.; subcontractor, including cell phone and emergency numbers.; Metropolitan’s permits and local, state, and federal environmental regulations, acts, laws, and ordinances.; requirements of all such permits and laws, regulations, acts, codes and ordinances.; Contractor with copies of all environmental permits obtained by Metropolitan.; All environmental or otherwise applicable permits procured by the Contractor.; requirements of issued disposal permits and applicable local, state, and federal laws and regulations.; All applicable equipment must have valid CARB registrations or local air quality management district permits.; power tools at all construction activity locations, in lieu of gas or diesel-powered compressors.; specially prepared for the work of the Contract shall be submitted as Shop Drawings, not as Product Data.; plumbing contractor; lead contractor.

BID WITH CAUTION 14 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: planetbids.com/portal/portal; will not accept any bid without proof of current registration to perform public work pursuant to Section 1725.; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; and repair damaged parts of the work.; The Contractor shall obtain all necessary permits from city and other government agencies, as necessary.; Work shall be performed under the terms and conditions of these permits.; subcontractor, including cell phone and emergency numbers.; Metropolitan’s permits and local, state, and federal environmental regulations, acts, laws, and ordinances.; requirements of all such permits and laws, regulations, acts, codes and ordinances.; Contractor with copies of all environmental permits obtained by Metropolitan.; All environmental or otherwise applicable permits procured by the Contractor.; requirements of issued disposal permits and applicable local, state, and federal laws and regulations.; All applicable equipment must have valid CARB registrations or local air quality management district permits.; power tools at all construction activity locations, in lieu of gas or diesel-powered compressors.; specially prepared for the work of the Contract shall be submitted as Shop Drawings, not as Product Data.; plumbing contractor; lead contractor.

Submission deadline

2023-07-27

Red flag teaser

14 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

14 found

Broad Indemnification

high

…work is to be completed is the essence of the Contract. acceptance of the work by Metropolitan. 15. (a) The Contractor shall defend, indemnify and save 20. By entering into this contract, the Contractor offers harmless Metropolitan, the Board, each member of the Board and agrees to assign to Metropolitan all right, title, interest in and Metropolitan's officers, agents and employees from all and

Hazardous Material / Abatement Coordination

high

…rkers' Compensation Insurance Certification 00700M — General Conditions PROJECT SPECIFICATIONS 01010M — Summary of Work 01060 — Safety and Regulatory Requirements 01065 — Environmental Requirements 01300 — Submittals 02112 — Asbestos Containing Material (ACM) Removal 02120 — Abatement, Demolition, and Removal of items containing lead EXHIBITS MS November 20, 2020 -1- M-3063 (construction contract

Liquidated Damages

high

…urance in accordance with the General Conditions, then the certified or cashier's check, or bidder's bond accompanying the bid shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies MS November 20, 2020 00100M-1 M-3063 (construction contract

Prevailing Wage / Certified Payroll

high

…shall post said copy at the jobsite. The Contractor national laws, county and municipal ordinances and shall pay not less than such prevailing wages to all workers regulations and orders of public bodies that in any manner employed on public work unless the project involves a total affect those engaged or employed in the work, or the materials consideration of one thousand dollars ($1,000.00) or…

Project Labor Agreement / Union Requirements

high

CCR §11024, and certifies that every employee not subject to the Project Labor Agreement (PLA) will have completed Sexual Harassment and Abusive Conduct training through one or more of the following training providers prior to accessing the project site or any Metropolitan property. California Department of Fair Employment and Housing (https://www.dfeh.ca.gov/shpt/)

Locked analysis

All deadlines table

2 dates
ItemDue
Mountain Pumping Plant Road, Earp, CA 92242 at 10:00 a.m., 2023-07-27
requirements of Document 00100, Instructions to Bidders, on or before 2:00 p.m., 2023-08-17

Locked analysis

Required certifications checklist

26 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all