← Public RFP analyses

Inland Feeder Rialto Pipeline Intertie

Source scope cues include: Inland Feeder/Rialto Pipeline Intertie; asbestos survey under contract with The Metropolitan Water District of Southern California. No warranties expressed or implied, are made by Clark Seif Clark, Inc. or its employe...; biphenyls (PCB) of the Inland Feeder, at STA 16+50.; maintenance, and for any future renovation/ demolition activities.; such as the transite siding and roof panels, general functional space measurements were used.; CSC collected one (1) bulk sample of potential PCB-containing material.; fibers are bound into the matrix of the material and pose little or no exposure hazard to building occupants.; licensed asbestos removal contractor.; Results are generated from the field sampling data (sampling volumes and areas, locations, etc.; not valid without the attached Scope of Accreditation..

BID WITH CAUTION 2 red flags detected : Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Inland Feeder/Rialto Pipeline Intertie; asbestos survey under contract with The Metropolitan Water District of Southern California. No warranties expressed or implied, are made by Clark Seif Clark, Inc. or its employe...; biphenyls (PCB) of the Inland Feeder, at STA 16+50.; maintenance, and for any future renovation/ demolition activities.; such as the transite siding and roof panels, general functional space measurements were used.; CSC collected one (1) bulk sample of potential PCB-containing material.; fibers are bound into the matrix of the material and pose little or no exposure hazard to building occupants.; licensed asbestos removal contractor.; Results are generated from the field sampling data (sampling volumes and areas, locations, etc.; not valid without the attached Scope of Accreditation..

Submission deadline

2022-10-27

Red flag teaser

2 red flags detected including Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200).

Locked analysis

Full red flag list with excerpts

2 found

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

…y analysis or were visually identified as ACM. B. LEAD-BASED PAINT No painted components were identified during the site survey. The HUD Guidelines define paint containing 5000 ppm (parts per million by weight) (0.5% by dry weight) using laboratory analysis, lead positive. C. UNIVERSAL WASTE MATERIALS The survey was conducted to meet the requirements of the EPA Resource Conservation and Recovery

Hazardous Material / Abatement Coordination

high

HEALTH AND SAFETY ENGINEERING ENVIRONMENTAL Project Number: 1031459 Re: Limited Asbestos Containing Materials, Lead-Based Paint and PCB Survey Report Inland Feeder/Rialto Pipeline Intertie San Bernardino, CA Task Order No. 19 CSC Local Office: Clark Seif Clark, Inc. PO Box 4299 Chatsworth, CA 91313 Office: 818-727-2553 Fax: 818-727-2556 Client: Metropolitan Water District of Southern Californi

Locked analysis

All deadlines table

4 dates
ItemDue
Report Issued 2022-10-27
PO Box 4299 Received 2022-10-14
Chatsworth, CA 91313 Analysis 2022-10-21
Collected 2022-10-10

Locked analysis

Required certifications checklist

1 items
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all