← Public RFP analyses

IIGC Downtown Water and Sewer Improvements

Source scope cues include: City of Fresno Community Workforce; City of Fresno; bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have bee; COORDINATION WITH UTILITIES AND OTHER CONTRACTORS A. Diligently coordinate construction operations with, and cooperate with, utility companies and agencies and other contractors...; click on “City Clerk”, then click on “Fresno Municipal Code” located in the middle of the page.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; Resolution setting forth facts constituting the emergency or necessity.; 4 Exclusions: The following shall be excluded from the scope of this Agreement.; Code and the applicable state prevailing wage determination.; labor arbitrator, the City and the Trades Council shall mutually agree to a replacement.; insurance proceeds to the named insured.; and non-owned automobiles or other licensed vehicles (Code 1- Any Auto).; responsible for the payment of any deductibles or self-insured retentions.; employees, agents and volunteers as an additional insured.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 7 CALAVERAST ST.

BID WITH CAUTION 20 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Fresno Community Workforce; City of Fresno; bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have bee; COORDINATION WITH UTILITIES AND OTHER CONTRACTORS A. Diligently coordinate construction operations with, and cooperate with, utility companies and agencies and other contractors...; click on “City Clerk”, then click on “Fresno Municipal Code” located in the middle of the page.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; Resolution setting forth facts constituting the emergency or necessity.; 4 Exclusions: The following shall be excluded from the scope of this Agreement.; Code and the applicable state prevailing wage determination.; labor arbitrator, the City and the Trades Council shall mutually agree to a replacement.; insurance proceeds to the named insured.; and non-owned automobiles or other licensed vehicles (Code 1- Any Auto).; responsible for the payment of any deductibles or self-insured retentions.; employees, agents and volunteers as an additional insured.; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; 7 CALAVERAST ST.

Submission deadline

2025-11-04

Red flag teaser

20 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

20 found

Back-Charge / Setoff Rights

high

…or. As an alternative to payment of such claims or obligations, City, in its sole discretion, may reduce the total Contract price or set-off the amount against payments due. WAIVER AND RELEASE FORMS Consistent with the provisions of California Civil Code Chapter 3 – Waiver and Release [8120 – 8138], the Contractor and its subcontractors shall promptly furnish the City with a release of all claims

Broad Indemnification

high

…m the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be fin

Hazardous Material / Abatement Coordination

high

(ii) In the event this Contract involves any lead-based environmental hazard (e.g., lead based paint), the Contractors Pollution Liability insurance policy shall be endorsed to include coverage for lead based environmental hazards. In the event this Contract involves any asbestos environmental hazard (e.g., asbestos remediation), the Contractors Pollution Liability insurance policy shall be endors

Lien Waiver / Waiver of Lien Rights

high

…he Contract Documents; or (iii) terms of special warranties required by the Contract Documents. Contractor shall promptly provide an unconditional waiver and release upon final payment in accordance with California Civil Code section 3262 and these Contract Documents. Except to the extent of any Claim arising from City’s sole or active negligence, and except to the extent Contractor expressly des

Liquidated Damages

high

…Proposal Form .......................................................................................... 1.2 Time of Completion and Liquidated Damages ................................................ 1.13 Time Period to Award Bid ............................................................................... 1.13 List of Subcontractors .............................................................

Locked analysis

All deadlines table

2 dates
ItemDue
SCHEDULED BID OPENING 2025-11-04
A pre-bid conference will be held at 10:00 AM, on Tuesday, 2025-10-14

Locked analysis

Required certifications checklist

27 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all