Source scope cues include: PREVAILING WAGE ----------------------------------------------------------------------------------------------- 6 P. INDEMNIFICATION; PlanetBids. Last Day for Questions will be January 27th, at 5:00 p.m. H. BID SUBMITTAL: Any bid found to be illegible or incomplete may be rejected. Bidders assume full responsi...; Bids will be received via PlanetBids, until 2:00 p.; Only electronic bids submitted via PlanetBids will be accepted.; work given by Inland Empire Utilities Agency.; responsibility for having their bid uploaded to PlanetBids no later than the scheduled closing time.; documentation, which includes information on the specific services rendered during the invoice period.; Invoices are subject to approval of the Project Manager and cannot be processed until approved.; pay the selected bidder’s invoice, within thirty (30) days following receipt of the approved invoice.; such services are repaired or corrected, and accepted, by the Project Manager.; in conjunction with this solicitation will be subject to prevailing wage.; located in the bid forms within this document.; itemize/detail components of proposed prices and/or invoices, i.; deducted, at the discretion of the Inland Empire Utilities Agency, with no adjustment to the unit costs submitted.; by IEUA will be taken as a direct credit against the Contractor’s invoice for this project.; representatives of all subcontractors, utilities, and others that are active in the execution of the Work..

BID WITH CAUTION 9 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: PREVAILING WAGE ----------------------------------------------------------------------------------------------- 6 P. INDEMNIFICATION; PlanetBids. Last Day for Questions will be January 27th, at 5:00 p.m. H. BID SUBMITTAL: Any bid found to be illegible or incomplete may be rejected. Bidders assume full responsi...; Bids will be received via PlanetBids, until 2:00 p.; Only electronic bids submitted via PlanetBids will be accepted.; work given by Inland Empire Utilities Agency.; responsibility for having their bid uploaded to PlanetBids no later than the scheduled closing time.; documentation, which includes information on the specific services rendered during the invoice period.; Invoices are subject to approval of the Project Manager and cannot be processed until approved.; pay the selected bidder’s invoice, within thirty (30) days following receipt of the approved invoice.; such services are repaired or corrected, and accepted, by the Project Manager.; in conjunction with this solicitation will be subject to prevailing wage.; located in the bid forms within this document.; itemize/detail components of proposed prices and/or invoices, i.; deducted, at the discretion of the Inland Empire Utilities Agency, with no adjustment to the unit costs submitted.; by IEUA will be taken as a direct credit against the Contractor’s invoice for this project.; representatives of all subcontractors, utilities, and others that are active in the execution of the Work..

Submission deadline

2026-01-20

Red flag teaser

9 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

9 found

Broad Indemnification

high

…---------- 5 O. PREVAILING WAGE ----------------------------------------------------------------------------------------------- 6 P. INDEMNIFICATION ----------------------------------------------------------------------------------------------- 6 Q. STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION: -------------------------- 7 R. AWARD / SELECTION CRITERIA ------------------------------------

Hazardous Material / Abatement Coordination

high

…gulation including, but not limited to, notifications, removal procedures, waste disposal, and training requirements needed of those asbestos items identified in the survey. The CONTRACTOR shall use whatever means are necessary to prevent and/or control visible dust including all the measures identified in SCAQMD Rule 403 to minimize dust. The CONTRACTOR shall take whatever steps, procedures, or

Liquidated Damages

high

…---------- 7 S. BID PRICE SCHEDULE -------------------------------------------------------------------------------------------- 7 T. LIQUIDATED DAMAGES ----------------------------------------------------------------------------------------- 7 U. FORCE ACCOUNT WORK --------------------------------------------------------------------------------------- 7 SECTION 3 - SCOPE OF WORK .................

Prevailing Wage / Certified Payroll

high

…----------------------------------------------- 5 N. EQUAL EMPLOYMENT OPPORTUNITY AND HARASSMENT PROHIBITION ------------------ 5 O. PREVAILING WAGE ----------------------------------------------------------------------------------------------- 6 P. INDEMNIFICATION ----------------------------------------------------------------------------------------------- 6 Q. STANDARD SPECIFICATION FOR PUBLI

Time is of the Essence / Strict Completion Deadline

high

…the satisfaction of IEUA ( ) calendar days after Award of the Contract. All Work shall be completed before final payment is made. G. Time is of the essence on this Contract. H. CONTRACTOR agrees that in case the Work is not completed before or upon the expiration of the Contract Time, damage will be sustained by IEUA, and that it is and will be impracticable to determine the actual damage which I

Locked analysis

All deadlines table

1 dates
ItemDue
A non-mandatory pre-bid job walk will be conducted on Tuesday, 2026-01-20

Locked analysis

Required certifications checklist

23 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all