← Public RFP analyses

HR Exit Door Installation

Source scope cues include: sealed envelope with all the original; PREVAILING WAGE ------------------------------------------------------------------------------------------------------------------6 O.; sealed proposal; paying all costs related to IEUA manpower, required to monitor/facilitate the work (Scope of Work Part B only).; given by Inland Empire Utilities Agency.; INQUIRIES: Technical inquiries regarding this solicitation should be directed to PlanetBids.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; bids delivered in an express courier package shall be sealed in a separate envelope within the courier package.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; Provide and install emergency exit sign above new doorway as shown in attachment B.; Permits issued by the jurisdictional regulatory agencies, if applicable.; removed/relocated at no additional cost the Agency.; be salvaged, relocated, or reinstalled.; Product Data: For each type of product.; 6075 Kimball Avenue, Building; 6075 Kimball Ave; 6075 Kimball Avenue.

BID WITH CAUTION 17 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: sealed envelope with all the original; PREVAILING WAGE ------------------------------------------------------------------------------------------------------------------6 O.; sealed proposal; paying all costs related to IEUA manpower, required to monitor/facilitate the work (Scope of Work Part B only).; given by Inland Empire Utilities Agency.; INQUIRIES: Technical inquiries regarding this solicitation should be directed to PlanetBids.; BID LABELING: The bid shall be submitted in a sealed envelope with all the original pages intact.; bids delivered in an express courier package shall be sealed in a separate envelope within the courier package.; until such services are repaired or corrected, and accepted, by the Project Manager.; contract issued in conjunction with this solicitation will be subject to prevailing wage.; itemize/detail components of proposed prices and/or invoices; i.; Provide and install emergency exit sign above new doorway as shown in attachment B.; Permits issued by the jurisdictional regulatory agencies, if applicable.; removed/relocated at no additional cost the Agency.; be salvaged, relocated, or reinstalled.; Product Data: For each type of product.; 6075 Kimball Avenue, Building; 6075 Kimball Ave; 6075 Kimball Avenue.

Submission deadline

2019-01-29

Red flag teaser

17 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

17 found

Broad Indemnification

high

…EVAILING WAGE ------------------------------------------------------------------------------------------------------------------6 O. INDEMNIFICATION -------------------------------------------------------------------------------------------------------------------6 P. STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION --------------------------------------------------7 Q. AWARD / SELECTION CRIT

Guaranteed Maximum Price (GMP) / Hard Budget Cap

high

…s compensation for the Work performed under this Contract, Agency shall pay Contractor’s monthly invoice, for a total contract price NOT-TO-EXCEED $XXXXXX for all services satisfactorily provided during the term of this Contract. C. Concurrent with the submittal of the original invoice to the Agency’s Accounts Payable Department, the Contractor shall forward (mail, fax, or email) a copy of the in

Hazardous Material / Abatement Coordination

high

…ORY MATERIALS A. Bituminous Paint: Cold-applied, asphalt-mastic paint complying with SSPC-Paint 12 requirements except containing no asbestos; formulated for 30-mil thickness per coat. B. Spandrel Panels: Aluminum spandrel panels above window head along west window wall. 1. Formed aluminum panel. a. Face sheets: 0.04 inch aluminum. b. Finish: Match aluminum glazing system. 2.8 FABRICATION A. Form

Liquidated Damages

high

…-------------------------------------------------------------------------------------------------------------------------------7 S. LIQUIDATED DAMAGES ------------------------------------------------------------------------------------------------------------7 T. FORCE ACCOUNT WORK -----------------------------------------------------------------------------------------------------------7 SECTION

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…his estimate as they prepare costs for this work. ENGINEERS ESTIMATE of PROBABLE COST = $28,500 C. PRE-BID and JOB-WALK MEETING: Non-Mandatory PRE-BID MEETING and JOB-WALK: January 29, 2019 at 10:00 A.M. 6075 Kimball Ave. Chino, CA 91708 “ HQ-B Lobby” D. SUBMITTAL LOCATION, CLOSING DATE, AND TIME: Bids will not be accepted after the "closing" date and time indicated. Faxed or emailed bids will no

Locked analysis

All deadlines table

1 dates
ItemDue
PRE-BID MEETING and JOB-WALK 2019-01-29

Locked analysis

Required certifications checklist

22 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all