← Public RFP analyses

Hollywood Tunnel North Portal Pressure Control Structure Valve Replacement

Source scope cues include: Department of General Services; planetbids.com/portal; language, and all numerical data furnished shall use the foot-pound-second system of units of measurement.; equal to 100 percent of the bid, exclusive of the amount allocated to services.; Metropolitan using the data in Document 00126, Equalizing Factors for Inspection.; issued by the local jurisdiction in which they are located.; factual data necessary to evaluate the claim.; Supporting data is subject to audit in accordance with Article 12.; description, unit price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; additional insureds with respect to the project covered by the Contract, during the period of the Contract.; Work Not Included: Installation will be performed by others at the Hollywood Tunnel located in Los Angeles, California.; specially prepared for the work of the Contract shall be submitted as Shop Drawings, not as Product Data.; Engineer, along with a hard copy of the letter of transmittal.; PDF and similarly tabbed in the hard copy, when a hard copy is specified.; articles to effectively avoid any unnecessary damage, repair or faulty production.; 09900 System NE; Electrical Contractors; Roofing Contractors.

BID WITH CAUTION 12 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Department of General Services; planetbids.com/portal; language, and all numerical data furnished shall use the foot-pound-second system of units of measurement.; equal to 100 percent of the bid, exclusive of the amount allocated to services.; Metropolitan using the data in Document 00126, Equalizing Factors for Inspection.; issued by the local jurisdiction in which they are located.; factual data necessary to evaluate the claim.; Supporting data is subject to audit in accordance with Article 12.; description, unit price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; additional insureds with respect to the project covered by the Contract, during the period of the Contract.; Work Not Included: Installation will be performed by others at the Hollywood Tunnel located in Los Angeles, California.; specially prepared for the work of the Contract shall be submitted as Shop Drawings, not as Product Data.; Engineer, along with a hard copy of the letter of transmittal.; PDF and similarly tabbed in the hard copy, when a hard copy is specified.; articles to effectively avoid any unnecessary damage, repair or faulty production.; 09900 System NE; Electrical Contractors; Roofing Contractors.

Submission deadline

2016-04-14

Red flag teaser

12 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

12 found

Broad Indemnification

high

…be made and become effective at the time Metropolitan tenders final payment to the bidder. 27. Indemnity. — (a) The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind, arising out of or in connections with work to be performed, including but not limited to: (1

Hazardous Material / Abatement Coordination

high

…skets 1. Gaskets for use with flanges with contact surfaces machined to a V-serrated finish shall be full-face and of compressed non-asbestos sheet 1/16-inch thick for flanges up to 20” and 1/8-inch thick for flanges 24” or larger. Quality shall be Garlock Blue-Gard 3000, Anchor Green Klinger C4401, Duralon 8500 Green, or equal. 2. Gaskets for use with flanges with smooth contact surfaces and whe

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, the bidder’s security, if furnished, shall be returned to the bidder within 5 days of Contract execution, or the bid bond, if furnis

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records he or she

Bid Bond Required

medium

…in a timely manner, the bidder’s security, if furnished, shall be returned to the bidder within 5 days of Contract execution, or the bid bond, if furnished, shall become void. Upon request, the security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of Document 00505, Agreement. 5. Withdrawal or Modification of Bids —A bidder may withdraw its bid bef

Locked analysis

All deadlines table

4 dates
ItemDue
Project Award 2016-04-14
Project Completion 1997-05-30
of Document 00100, Instructions to Bidders, on or before 2:00 p.m., 2025-01-16
END-OF-LINE SLEEVE VALVE DATA SHEET 2024-09-24

Locked analysis

Required certifications checklist

18 items
  • Include bid bond
  • Include performance bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include W-9 or taxpayer information
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all