Hinds Pumping Plant Interim Employee Housing Rehabilitation

Source scope cues include: Prevailing Wage plus the Contractor’s markup for time, materials, and equipment. The initial contract will be a not-to-exceed amount of; planetbids.com/portal/portal; Interim Employee Housing Rehabilitation located in Riverside County, CA in accordance with Specifications No.; Name of the EPA-certified renovation firm and attach certification from the EPA.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; agents shall, at all times, have immediate access to warehouses not located at the project site used for storage of materials.; shall, whenever so requested, give the Engineer access to the proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; paid less than the prevailing wage rate shall be paid to each worker by the Contractor.; Electrical Contractors.

BID WITH CAUTION 18 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Prevailing Wage plus the Contractor’s markup for time, materials, and equipment. The initial contract will be a not-to-exceed amount of; planetbids.com/portal/portal; Interim Employee Housing Rehabilitation located in Riverside County, CA in accordance with Specifications No.; Name of the EPA-certified renovation firm and attach certification from the EPA.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; subsequent replacement, as directed and approved by the Engineer.; Metropolitan for the unsatisfactory work and its replacement in excess of the requirements for satisfactory original construction.; agents shall, at all times, have immediate access to warehouses not located at the project site used for storage of materials.; shall, whenever so requested, give the Engineer access to the proper invoices, bills of lading, etc.; (b) The prevailing wage rates shall be paid for all work performed under the Contract.; paid less than the prevailing wage rate shall be paid to each worker by the Contractor.; Electrical Contractors.

Submission deadline

2023-04-12

Red flag teaser

18 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

18 found

Broad Indemnification

high

…from all claims of any kind arising directly or indirectly out of the performance of the work. (f) Indemnity. — The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind which may arise from or in connection with the performance of the work and the results of tha

Hazardous Material / Abatement Coordination

high

…Action 24. Inspection 60. Differing or Unusual Site Conditions 25. Examination of Work 61. Hazardous Substance, Hazardous Waste, or Asbestos- 26. Defective Work or Material Related Work 27. Right of Property in Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents a

Liquidated Damages

high

…n Materials 62. Hazardous Material 28. Title to Materials Found on the Work 63. Hazardous Waste 29. Access to Work 64. Insurance 30. Liquidated Damages 65. Payrolls and Records 31. Patents and Copyrights 66. Non-Use of Intellectual Property of Third Parties 32. No Payment for Temporary or Preliminary Works 67. Prohibited Relationships with Sanctioned Countries 33. Partial Estimates and Persons 34

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…s of prospective bidders at 11:00 a.m., April 27, 2023. Attendance at this pre-bid conference by bidders that attended the first two mandatory pre-bid conferences on March 29, 2023 or April 12, 2023 under Spec No. 2069 is not required. No new information will be provided at this pre-bid conference. Attendance at one of the three pre-bid conferences is a condition precedent to submittal of a bid,

Prevailing Wage / Certified Payroll

high

…tan’s representative based on time and materials. N-4 Metropolitan expects to award a construction contract on a basis of California Prevailing Wage plus the Contractor’s markup for time, materials, and equipment. The initial contract will be a not-to-exceed amount of $250,000. However, Metropolitan may issue a change to the contract regarding the number of homes and scope of work, and/or total a

Locked analysis

All deadlines table

2 dates
ItemDue
March 29, 2023 or 2023-04-12
bidders that attended the first two mandatory pre-bid conferences on 2023-03-29

Locked analysis

Required certifications checklist

24 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all