High Friction Surface Treatment, Hawk Signals, and Signal Timing Plans

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; planetbids.com/portal/portal; bond requirements. 3. Work requires a contractor’s license and listed DBE does not have a valid license under Contractors License Law. 4. Listed DBE fails or refuses to perform...; Section 2 – Scope And Control Of The Work .; Riverside Public Utilities Water Division Specification No.; Any additional data to support demonstration of good faith efforts.; DBE fails to meet the Contractor’s bond requirements.; submitted via “Q&A” through the City’s Electronic Bidding System, PlanetBids Vendor Portal.; properly licensed in accordance with the laws of this state.; with the exception of when the grade of curb and gutter is less than 0.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; Contractor must use an Additional Insured Endorsement approved by the City.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, California..

BID WITH CAUTION 17 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE FINANCE; City of Riverside Public Works; BID BOND OR CASHIERS CHECK IS REQUIRED WITH THIS BID U U All Bids and any supplemental documents as called for by the Special Provisions (unless otherwise U noted in th; planetbids.com/portal/portal; bond requirements. 3. Work requires a contractor’s license and listed DBE does not have a valid license under Contractors License Law. 4. Listed DBE fails or refuses to perform...; Section 2 – Scope And Control Of The Work .; Riverside Public Utilities Water Division Specification No.; Any additional data to support demonstration of good faith efforts.; DBE fails to meet the Contractor’s bond requirements.; submitted via “Q&A” through the City’s Electronic Bidding System, PlanetBids Vendor Portal.; properly licensed in accordance with the laws of this state.; with the exception of when the grade of curb and gutter is less than 0.; repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals.; 1 Prevailing Wages/Certified Payrolls.; Provide Additional Insured Endorsement.; Contractor must use an Additional Insured Endorsement approved by the City.; 3900 Main Street, Riverside, CA; 3900 Main Street, Riverside CA; 3900 Main Street, Riverside, California..

Submission deadline

2021-08-12

Red flag teaser

17 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

17 found

Back-Charge / Setoff Rights

high

…ges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether

Broad Indemnification

high

…is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 2-2.2 Assignment by City. The improvement contemplated in the performance of this Contract is a

Hazardous Material / Abatement Coordination

high

…ication Date 0 01/01/2021 1 01/08/2021 2 01/22/2021 3 03/05/2021 4 03/19/2021 5 04/30/2021 6 06/25/2021 ASBE0005-002 07/06/2020 Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 45.39 23.74 Fire Stop Technician (Application of Firestopping Materials for wall opening

Liquidated Damages

high

…ty to accommodate another contract, even with the City. For each incident the Contractor does not submit an updated weekly schedule, liquidated damages will be assessed as described in Section 6-9 of these Special Provisions. Upon execution of the Contract Agreement, the Contractor shall proceed with the ordering of materials including traffic signal poles and/or street light poles to be furnishe

No Material Substitutions Without Owner Approval

high

…Specifications. 201-1 PORTLAND CEMENT CONCRETE 201-1.2.1 Portland Cement. Portland Cement for CSPB shall be Type II or V. There are no substitutions for Portland Cement. 203-5 SLURRY SEAL 203-5.4.2.1 Aggregate. Aggregate shall be Type II. 203-5.4.2.2 Emulsified Asphalt. Emulsified asphalt shall be CQS-1h. 203-5.4.2.4 Latex. The latex additive shall be ULTRAPAVE 65K or an approved equal. The latex

Locked analysis

All deadlines table

2 dates
ItemDue
Bids are to be submitted no later than 2021-08-12
Bid 7803 – Special Provisions Part 1, Page 8 2021-07-22

Locked analysis

Required certifications checklist

23 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all