← Public RFP analyses

HD-S3224 RECYCLING OF ASPHALT, CONCRETE MATERIALS, AND OTHER RELATED SERVICES AT POLB RUBBLE SITE

Source scope cues include: Stored materials shall be located so as to facilitate prompt inspection.; mode, including fuel, fuel testing, emissions testing and permits.; Hour (HR) can be invoiced for a minimum of four (4) HR per OCTO.; Each (EA) can be invoiced for a minimum of one (1) EA per OCTO.; Harbor District at a properly licensed facility.; implemented in the event of an onsite emergency..

BID WITH CAUTION 2 red flags detected : Liquidated Damages

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Stored materials shall be located so as to facilitate prompt inspection.; mode, including fuel, fuel testing, emissions testing and permits.; Hour (HR) can be invoiced for a minimum of four (4) HR per OCTO.; Each (EA) can be invoiced for a minimum of one (1) EA per OCTO.; Harbor District at a properly licensed facility.; implemented in the event of an onsite emergency..

Submission deadline

Not listed in the public preview.

Red flag teaser

2 red flags detected including Liquidated Damages.

Locked analysis

Full red flag list with excerpts

2 found

Liquidated Damages

high

…ions, the Contractor shall crush a minimum of 6,000 Tons (TN) of crushed miscellaneous base (CMB) per calendar week or be subject to liquidated damages. The Contractor may work overtime and on weekends and holidays to meet this requirement upon notice to the Engineer, at no extra cost to the City. The Contractor shall complete each OCTO work at the earliest date possible as time is of the essence

Time is of the Essence / Strict Completion Deadline

high

…rk overtime and on weekends and holidays to meet this requirement upon notice to the Engineer, at no extra cost to the City. The Contractor shall complete each OCTO work at the earliest date possible as time is of the essence. The Contractor is responsible for maintenance of the worksite. The Contractor shall maintain ingress/egress to the site at all times. The Contractor shall keep HD-S3224 TS-

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

2 items
  • Include references or past project experience
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all