HD-S3173 ON-CALL SERVICES FOR ASPHALT PAVING, TRAFFIC STRIPING, AND OTHER RELATED SERVICES at VARIOUS LOCATIONS LONG BEACH, CALIFORNIA

Source scope cues include: On-Call Services for Asphalt Paving, Traffic Striping, and; CITY OF LONG BEACH; City of Long Beach Harbor; sealed proposal; Bond Requirements. 11.2.1.1 Contractor shall furnish a Performance Bond and a Payment Bond, on the forms provided by City. The Performance Bond shall be furnished as a guarantee...; of the hard copy submittals with a paperclip.; into a single, large-sized sealed envelope.; the Prospective Bidders list located under the “Prospective Bidders” tab.; after Board’s Conditional Award of the Contract (“Bid Security”).; Bid submitted without Bid Security will be rejected as non-responsive.; which time the Bid Security will be returned to all Bidders.; by using the current verifiable data.; with proof of submittal to the City.; 7 Permits, Notices and Compliance with Applicable Law .; 23 Public Utilities and House Connections .; 1 Determination of Prevailing Wage Rate .; 2 Payment of Prevailing Wage Rates .; 3 Penalty for Prevailing Wage Rate Underpayment .; 10 Responsibility for Subcontractors’ Payment of Prevailing Wages .; 3939 Atlantic Ave.

BID WITH CAUTION 22 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: On-Call Services for Asphalt Paving, Traffic Striping, and; CITY OF LONG BEACH; City of Long Beach Harbor; sealed proposal; Bond Requirements. 11.2.1.1 Contractor shall furnish a Performance Bond and a Payment Bond, on the forms provided by City. The Performance Bond shall be furnished as a guarantee...; of the hard copy submittals with a paperclip.; into a single, large-sized sealed envelope.; the Prospective Bidders list located under the “Prospective Bidders” tab.; after Board’s Conditional Award of the Contract (“Bid Security”).; Bid submitted without Bid Security will be rejected as non-responsive.; which time the Bid Security will be returned to all Bidders.; by using the current verifiable data.; with proof of submittal to the City.; 7 Permits, Notices and Compliance with Applicable Law .; 23 Public Utilities and House Connections .; 1 Determination of Prevailing Wage Rate .; 2 Payment of Prevailing Wage Rates .; 3 Penalty for Prevailing Wage Rate Underpayment .; 10 Responsibility for Subcontractors’ Payment of Prevailing Wages .; 3939 Atlantic Ave.

Submission deadline

Not listed in the public preview.

Red flag teaser

22 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

22 found

Back-Charge / Setoff Rights

high

…ll such tests, except for testing of any material that fails to meet the requirements of the Contract Documents, which cost shall be backcharged against the Contractor. 3.30.2 Other Work. All Work is subject to inspection and acceptance by the Engineer. The Engineer will make, or have made, such inspections and tests as he/she/they deem necessary to see that the Work is in conformance with the Co

Broad Indemnification

high

…-41 GC – 3.17 Royalties, Patents, Copyrights and Infringement ....................................................... G-41 GC – 3.18 Indemnification ........................................................................................................... G-42 GC – 3.19 Use of Explosives ......................................................................................................... G-4

Certified Small Business Set-Aside / Local Business Eligibility

high

…n or less, or small business manufacturers with 25 or fewer employees. 21.3. Certification 21.3.1. All businesses wishing to receive SBE and VSBE status on a Port contract are required to be certified by either the Port or by the DGS. 21.3.2. A link to the Port’s online procurement system is provided on the Port’s website at www.polb.com/sbe. 21.3.3. To access the DGS procurement system, business

Lien Waiver / Waiver of Lien Rights

high

…nd to pay to a Subcontractor or Material Supplier because of a dispute or other reason, or as to which an appropriate conditional or unconditional waiver and release of rights upon payment has not been provided. 9.2.2 City‘s Review of Applications for Payment. In accordance with Public Contract Code §20104.50, upon receipt of an application for payment, the Engineer shall review the application.

Liquidated Damages

high

…ssion for the development in the Harbor District as set forth in the California Coastal Act, California Public Resources Code, Division 20. 1.1.49 Liquidated Damages. Liquidated Damages are the monetary amounts established in the Special Conditions to be forfeited to the City for each day of Contractor’s delay in completion of the Work within the Contract Time and specified G-5 GC 70223.2 HD-S317

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

23 items
  • Complete bid/proposal form
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all