Back-Charge / Setoff Rights
high…ll such tests, except for testing of any material that fails to meet the requirements of the Contract Documents, which cost shall be backcharged against the Contractor. 3.30.2 Other Work. All Work is subject to inspection and acceptance by the Engineer. The Engineer will make, or have made, such inspections and tests as he/she/they deem necessary to see that the Work is in conformance with the Co