← Public RFP analyses

HD-S3172 ON-CALL CONSTRUCTION EQUIPMENT RENTAL AND FENCING SERVICE AND INSTALLATION PORT-WIDE LONG BEACH, CALIFORNIA

Source scope cues include: City of Long Beach within; City of Long Beach on; invoiced for the number of Time-and-a-Half overtime hours on site.; The form of invoices, job tickets, etc.; licensed hazardous waste transporter.; (TSCA) Polychlorinated Biphenyl (PCB) Hazardous Waste, per 40 CFR Part 761.; The SSSP shall identify all necessary emergency phone numbers.; the Contractor shall immediately repair or replace the utility.; owner, until the utility is permanently repaired.; 12328 Hibiscus Road; 2801 Madera Road; 600 East Ave.

BID WITH CAUTION 2 red flags detected : Submitted Proposals Become Owner/Consortium Property

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Long Beach within; City of Long Beach on; invoiced for the number of Time-and-a-Half overtime hours on site.; The form of invoices, job tickets, etc.; licensed hazardous waste transporter.; (TSCA) Polychlorinated Biphenyl (PCB) Hazardous Waste, per 40 CFR Part 761.; The SSSP shall identify all necessary emergency phone numbers.; the Contractor shall immediately repair or replace the utility.; owner, until the utility is permanently repaired.; 12328 Hibiscus Road; 2801 Madera Road; 600 East Ave.

Submission deadline

Not listed in the public preview.

Red flag teaser

2 red flags detected including Submitted Proposals Become Owner/Consortium Property.

Locked analysis

Full red flag list with excerpts

2 found

Submitted Proposals Become Owner/Consortium Property

medium

Removed materials shall become property of the Contractor and shall be hauled out of Port property. B. “Furnish and Install 8-foot Chain-link Fence”. Fence shall be furnished and paid for by the lineal foot (LF) and shall include the following: 1. 8-foot chain-link fence fabric. 2. One (1) line post set with 8-inch concrete collar at 10-feet maximum spacing. 3. Top rail with couplings. 4. Bottom t

Sustainability / LEED Compliance Requirement

medium

…ted for use as Bedding or Backfill Material within the Project Limits, per the Contract Documents. Import Soil shall comply with the Environmental Requirements for Soil and Fill Material in Appendix L. S. Liquid Waste: Liquid, fluid, or sludge potentially containing regulated substances, other than Storm Water managed under the SWPPP that is removed by the Contractor during the performance of the

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

3 items
  • Acknowledge all addenda
  • Include references or past project experience
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all