← Public RFP analyses

HD-S3116 HEAVY HAUL ROUTE IMPROVEMENTS AT ANAHEIM WAY & FARRAGUT AVENUE

Source scope cues include: City of Los Angeles; City of Los Angles and; Protect existing utilities and pipelines, as shown on the Drawings.; The work shall be located on Farragut Avenue and Anaheim Way.; The POLB Rubble Site is located as shown in Appendix P.; and abandoned) located in the Work Site.; Coordinate work for City of Los Angles and Caltrans encroachment permits.; permits, quality control, inspection and related items.; documentation, inspections and notifications required by permits.; Define arrangements for safety, first aid, emergency actions and security.; activities to facilitate report organization, data searches, etc.; and everything on or after the data date is work planned to be completed.; number, data date, submittal number, and date of the submittal on each page.; Activity descriptions shall briefly convey scope and location of work indicated.; percent (20%) of the invoiced amount of costs until the TIA is submitted.; The narrative shall discuss any added changes in scope, if applicable.; permits throughout the duration of the project.; detail, the entire scope and duration of the Project.; 20 MPH Road.

BID WITH CAUTION 7 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Los Angeles; City of Los Angles and; Protect existing utilities and pipelines, as shown on the Drawings.; The work shall be located on Farragut Avenue and Anaheim Way.; The POLB Rubble Site is located as shown in Appendix P.; and abandoned) located in the Work Site.; Coordinate work for City of Los Angles and Caltrans encroachment permits.; permits, quality control, inspection and related items.; documentation, inspections and notifications required by permits.; Define arrangements for safety, first aid, emergency actions and security.; activities to facilitate report organization, data searches, etc.; and everything on or after the data date is work planned to be completed.; number, data date, submittal number, and date of the submittal on each page.; Activity descriptions shall briefly convey scope and location of work indicated.; percent (20%) of the invoiced amount of costs until the TIA is submitted.; The narrative shall discuss any added changes in scope, if applicable.; permits throughout the duration of the project.; detail, the entire scope and duration of the Project.; 20 MPH Road.

Submission deadline

Not listed in the public preview.

Red flag teaser

7 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

7 found

Hazardous Material / Abatement Coordination

high

3. Diagrams – For multiple energy sources 4. Training Records J. Asbestos – Contractor’s Asbestos Safety Program and a Project Specific Asbestos Abatement Plan shall be submitted to the City for review when the project requires the Contractor to disturb asbestos-containing construction materials as defined by Cal/OSHA. Prior to starting work activity, the Contractor shall submit to the City the Pr

No Material Substitutions Without Owner Approval

high

…Contract Drawing numbers. J. Clearly identify all approved deviations from Contract Drawings and Specifications, including or-equal substitutions, and references to the written approval(s) from Engineer. K. Show executed internal review and approval marking. Submittals which are received from sources other than through Contractor’s office or which have not undergone Contractor review will be retu

Project Labor Agreement / Union Requirements

high

…erein, applicable laws, transportation, traffic, air quality, noise, or any other applicable regulatory requirements, regulations or collective bargaining agreements pertaining to labor. 14. Baseline Schedule shall include a schedule basis that defines the premise for the development of the project schedule. It shall assist the project team and stake holders in identifying any key elements, issue

Sensitive Tenant Work Requires After-Hours Installation and Personnel Notice

high

…licable: Submit in accordance with Part 3.12 herein. PART 2 – PRODUCTS NOT USED PART 3 – EXECUTION 3.01 PERMITS AND NOTIFICATIONS A. Secure and pay for permits, governmental fees and licenses necessary to construct and complete the project as specified in General Conditions GC - 3.7, “Permits, Notices and Compliance with Applicable Law,” Special Conditions SC - 5.4, "Special Permit Requirements,"

Background Check / Drug Testing Requirement

medium

…pecific site and project security plan, separate from the CMP, is in place. This plan may include, but is not limited to, Contractor background checks on personnel working on the project, and 24-hour security monitoring on the project (physical/electronic). VIEWS AND LOCAL CHARACTER QL3.3 Identify natural or man-made features deemed important to views or local character and describe how they wi

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

4 items
  • Acknowledge all addenda
  • Include references or past project experience
  • Include safety documents if required
  • Resolve before bid: Sensitive Tenant Work Requires After-Hours Installation and Personnel Notice

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all