Source scope cues include: City of Long Beach; City of Long Beach Noise; Protect existing utilities and pipelines, as shown on the Drawings.; The Work Sites at the Toyota site are located north of Channel No.; two (2) proposed valve replacements adjacent to a 25 mph zone.; There are three (3) proposed valve replacements within the Toyota and NGC, Inc.; proposed valve replacements in the access road between the Marathon and PCMC sites.; There is one (1) isolation valve to be utilized in the PCMC site in Pier B.; building, fence and HVAC unit and adjacent to an existing container storage areas.; inspections and notifications required by permits.; Define arrangements for safety, first aid, emergency actions and security.; Discuss coordination and notification for utility work, and use of onsite utilities.; facilitate report organization, data searches, etc.; everything on or after the data date is work planned to be completed.; Activity descriptions shall briefly convey scope and location of work indicated.; The Data Date of the Baseline Schedule shall be the date of Notice to Proceed.; Data Date shall be the first day of the following month or as designated by the Engineer.; calculations, and other descriptive data to show information which is applicable to Contract.; 12328 Hibiscus Road; 2801 Madera Road; 600 East Ave.

BID WITH CAUTION 4 red flags detected : Hazardous Material / Abatement Coordination

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Long Beach; City of Long Beach Noise; Protect existing utilities and pipelines, as shown on the Drawings.; The Work Sites at the Toyota site are located north of Channel No.; two (2) proposed valve replacements adjacent to a 25 mph zone.; There are three (3) proposed valve replacements within the Toyota and NGC, Inc.; proposed valve replacements in the access road between the Marathon and PCMC sites.; There is one (1) isolation valve to be utilized in the PCMC site in Pier B.; building, fence and HVAC unit and adjacent to an existing container storage areas.; inspections and notifications required by permits.; Define arrangements for safety, first aid, emergency actions and security.; Discuss coordination and notification for utility work, and use of onsite utilities.; facilitate report organization, data searches, etc.; everything on or after the data date is work planned to be completed.; Activity descriptions shall briefly convey scope and location of work indicated.; The Data Date of the Baseline Schedule shall be the date of Notice to Proceed.; Data Date shall be the first day of the following month or as designated by the Engineer.; calculations, and other descriptive data to show information which is applicable to Contract.; 12328 Hibiscus Road; 2801 Madera Road; 600 East Ave.

Submission deadline

Not listed in the public preview.

Red flag teaser

4 red flags detected including Hazardous Material / Abatement Coordination.

Locked analysis

Full red flag list with excerpts

4 found

Hazardous Material / Abatement Coordination

high

…plicable sections of Specifications and in particular: 1. Section 01 57 19, "Temporary Environmental Controls" 2. Section 02 82 13, “Asbestos Abatement” 3. Section 01 76 00, “Protecting Installed Construction” 4. Section 31 00 00, “Earthwork” 1.03 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00, “Submittal Procedures”, and shall include contract-specific Site Specific Safety

Differing / Unknown Site Conditions (Contractor Risk)

medium

…a: As shown on the Drawings, and refer to Appendix V. 3. POLB Rubble Sites: Within seven miles (7) radius of the Project site(s). B. EXISTING SITE CONDITIONS 1. The Work Sites at the Toyota site are located north of Channel No. 2, south of Pier B Street, west of Edison Avenue and east of Carrack Avenue. The sites are paved and serves as a parking lot for new Toyota inventory. There is one (1) loc

Submitted Proposals Become Owner/Consortium Property

medium

1.07 WASTE MANAGEMENT AND DISPOSAL A. All materials shall remain the property of the City and shall be managed in accordance with these specifications. B. Contractor shall be responsible for paying all required transportation costs, loading and unloading costs, ancillary storage costs, and disposal fees and tipping fees. C. Portland cement concrete and asphalt concrete demolished that is suitable…

Sustainability / LEED Compliance Requirement

medium

…iods, Punch List and verification/sign-off activities leading to Substantial Completion, Weather Allowance, Intermediate Milestones, LEED / Commissioning, Affidavit of Final Completion. 3.04 INCLEMENT WEATHER DELAYS A. The Contractor account for sufficient time for seasonally anticipated weather delays in the schedule by inserting a separate activity to represent a bank of inclement weather days,

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

3 items
  • Acknowledge all addenda
  • Include references or past project experience
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all