HD-S2473 PIER A WAY- PAVEMENT REHABILITATION PROJECT at PIER A WAY- PIER A PLAZA TO PIER B STREET

Source scope cues include: City of Long Beach; Prevailing Wage Rates and Employment of Apprentices. This Project is a public work as defined in Labor Code Section 1720. The Contracto; Bid Security, Signed Contract, Insurance and Bonds. Each Bid shall be; com/economics/contractors/forms_permits/default.; which a minimum of five percent (5%) must be allocated to VSBEs.; NIB -8 Prevailing Wage Rates and Employment of Apprentices.; NIB -11 Bid Security, Signed Contract, Insurance and Bonds..

BID WITH CAUTION 7 red flags detected : Liquidated Damages

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Long Beach; Prevailing Wage Rates and Employment of Apprentices. This Project is a public work as defined in Labor Code Section 1720. The Contracto; Bid Security, Signed Contract, Insurance and Bonds. Each Bid shall be; com/economics/contractors/forms_permits/default.; which a minimum of five percent (5%) must be allocated to VSBEs.; NIB -8 Prevailing Wage Rates and Employment of Apprentices.; NIB -11 Bid Security, Signed Contract, Insurance and Bonds..

Submission deadline

2014-10-07

Red flag teaser

7 red flags detected including Liquidated Damages.

Locked analysis

Full red flag list with excerpts

7 found

Liquidated Damages

high

…AC pavement. Construction Survey. Refer to Section 01110, Summary of Work in the Technical Specifications. NIB -4 Contract Time and Liquidated Damages. The Work shall be completed within 120 calendar days as provided in Paragraph SC - 6.1 of the Special Conditions, from a date specified in a written “Notice to Proceed” issued by the City and subject to adjustment as provided in Section 3.1 of the

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…ermit Applications and other Port forms are available at http://www.polb.com/economics/contractors/forms_permits/default.asp. NIB -2 Mandatory Pre-Bid Meeting and Site Visit. The engineering staff of the City’s Harbor department will conduct a pre-bid meeting at 10:00 a.m. on September 16, 2014, in the 1st Floor Meeting Room of the Port of Long Beach Maintenance Facility, 725 Harbor Plaza, Long B

Prevailing Wage / Certified Payroll

high

…E Office at (562) 283-7598 or sbeprogram@polb.com. You may also view the Port’s SBE program requirements at www.polb.com/sbe. NIB -8 Prevailing Wage Rates and Employment of Apprentices. This Project is a public work as defined in Labor Code Section 1720. The Contractor receiving award of the Contract and Subcontractors of any tier shall pay not less than the prevailing wage rates to all workers e

Retainage

high

…f Bid Irrevocability. Bids shall remain open and valid and Bidder’s Bonds shall be guaranteed for ninety (90) calendar days after the Bid Deadline or until the Chief Executive executes a Contract, whichever occurs first. NIB -14 Substitution of Securities. Substitution of Securities for retainage is permitted in accordance with Section 22300 of the Public Contract Code. NIB 053114 gsc N-4 HD-S247

MBE/WBE/DBE Participation Requirement

medium

…may view the Port website at http://www.polb.com/economics/contractors/default.asp. Copies of all Port insurance endorsement forms, SBE/VSBE Program forms, Harbor Development Permit Applications and other Port forms are available at http://www.polb.com/economics/contractors/forms_permits/default.asp. NIB -2 Mandatory Pre-Bid Meeting and Site Visit. The engineering staff of the City’s Harbor depar

Locked analysis

All deadlines table

3 dates
ItemDue
Bid Deadline: Prior to 10:00 a.m. on Tuesday, 2014-10-07
Contract Documents Available: /: Beginning Thursday, 2014-08-28
Mandatory / 2014-09-16

Locked analysis

Required certifications checklist

9 items
  • Include bid bond
  • Confirm mandatory pre-bid meeting or site visit attendance
  • Confirm prevailing wage / certified payroll requirements
  • Verify requirement: Performance and Payment Bond
  • Track deadline: Bid Deadline: Prior to 10:00 a.m. on Tuesday,
  • Resolve before bid: Prevailing Wage / Certified Payroll
  • Resolve before bid: Retainage
  • Resolve before bid: MBE/WBE/DBE Participation Requirement

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all