← Public RFP analyses

HD-S2467 SOUTH WATERFRONT PIER J BIKE AND PEDESTRIAN PATH, SEGMENT 1

Source scope cues include: CITY OF LONG BEACH; City of Long Beach Harbor; prevailing wage requirements of the Davis‐Bacon and related acts will be enforced. In the event of a conflict between Federal and State; prevailing wage requirements of the Davis‐Bacon and related acts will be enforced.; The bid line items included in the Schedule of Bid Items are located on the PB System.; The Subcontractor Detail Form is located on the PB System..

BID WITH CAUTION 3 red flags detected : Prevailing Wage / Certified Payroll

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF LONG BEACH; City of Long Beach Harbor; prevailing wage requirements of the Davis‐Bacon and related acts will be enforced. In the event of a conflict between Federal and State; prevailing wage requirements of the Davis‐Bacon and related acts will be enforced.; The bid line items included in the Schedule of Bid Items are located on the PB System.; The Subcontractor Detail Form is located on the PB System..

Submission deadline

Not listed in the public preview.

Red flag teaser

3 red flags detected including Prevailing Wage / Certified Payroll.

Locked analysis

Full red flag list with excerpts

3 found

Prevailing Wage / Certified Payroll

high

…erprises (DBE) and First‐Tier Subcontractors This is a federally‐assisted construction contract. Federal Labor Standard Provisions, including prevailing wage requirements of the Davis‐Bacon and related acts will be enforced. In the event of a conflict between Federal and State wage rates, the higher of the two will prevail. Bid Proposal Package 031716 gsc Form BP: Bidder’s Proposal HD‐S2467 Page

MBE/WBE/DBE Participation Requirement

medium

BID PROPOSAL PACKAGE Appendix HH Disclosure of Lobbying Activities (Standard Form LLL) Exhibit 12‐B Bidder’s List of Appendix HH Subcontractors Exhibit 15‐G Local Agency Bidder DBE Appendix HH Commitment (Construction Contracts) Exhibit 15‐H DBE Information – Good Appendix HH Faith Efforts

Section 3 / Community / Local Hiring Requirement

medium

BID PROPOSAL PACKAGE Section 3. Corporation Names of Officers By Printed Name Corporate Officer Title [President/Chairman of the Board/Vice President] Signature By Printed Name Corporate Officer Title [Secretary/Chief Financial Officer/ Assistant Treasurer] Signature Incorporated under the laws of the State of Bid Proposal Package 031716 gsc Form BP: Bidder’s Proposal HD‐S2467 Page 8

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

7 items
  • Include bid bond
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include subcontractor list if required
  • Confirm prevailing wage / certified payroll requirements
  • Verify requirement: Disadvantaged Business Enterprise Certification
  • Resolve before bid: Prevailing Wage / Certified Payroll

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all