← Public RFP analyses

HD-S2410A FIREBOAT STATION NO. 20 at PIER D, BERTHS D50-51 LONG BEACH, CALIFORNIA

Source scope cues include: CITY OF LONG BEACH; Department of General Services; Bid Security and rescission of the Conditional Award by the Board of Harbor Commissioners. E. Contractor’s Certification. The undersigned certifies that Contractor License; The bid line items included in the Schedule of Bid Items are located on the PB System.; The Subcontractor Detail Form is located on the PB System..

BID WITH CAUTION 3 red flags detected : Certified Small Business Set-Aside / Local Business Eligibility

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF LONG BEACH; Department of General Services; Bid Security and rescission of the Conditional Award by the Board of Harbor Commissioners. E. Contractor’s Certification. The undersigned certifies that Contractor License; The bid line items included in the Schedule of Bid Items are located on the PB System.; The Subcontractor Detail Form is located on the PB System..

Submission deadline

Not listed in the public preview.

Red flag teaser

3 red flags detected including Certified Small Business Set-Aside / Local Business Eligibility.

Locked analysis

Full red flag list with excerpts

3 found

Certified Small Business Set-Aside / Local Business Eligibility

high

…nly list SBEs/VSBEs. 2. If the prime contractor is an SBE/VSBE, list the prime first. 3. For a firm to be counted toward meeting the SBE/VSBE goals, the firm must be SBE certified on the Port’s online vendor database PB System (accessible from the SBE/VSBE Program page of the Port’s website: www.polb.com/sbe ), or by the State of California’s Department of General Services (DGS). 4. The Port does

MBE/WBE/DBE Participation Requirement

medium

…er’s Security √ Iran Contracting Act Compliance Form ICA √ Affidavit Form SL Subcontractor List √ Form CR2 Experience Requirements √ SBE/VSBE Commitment Plan for Form SBE-2C √ Construction Contracts Cover Sheet Form BS Hard Copy Cover Sheet (2) (1) Not Used. (2) Attach to hard copy submittals following Bid Deadline – see Instructions to Bidders BPP 50818.1p Bid Proposal Package Contents HD-S2410A

Section 3 / Community / Local Hiring Requirement

medium

BID PROPOSAL PACKAGE Section 3. Corporation Names of Officers By Printed Name Corporate Officer Title [President/Chairman of the Board/Vice President] Signature By Printed Name Corporate Officer Title [Secretary/Chief Financial Officer/ Assistant Treasurer] Signature Incorporated under the laws of the State of BPP 50818.1p Form BP: Bidder’s Proposal HD-S2410A Page 6

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

5 items
  • Include bid bond
  • Include contractor license information
  • Acknowledge all addenda
  • Include subcontractor list if required
  • Verify requirement: Small Business Enterprise Certification

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all