← Public RFP analyses

HAWK Signal Improvements for First Street and Dovewood Lane

Source scope cues include: ABBREVIATIONS: 2. CONTRACTOR WILL NOTIFY F.M.F.C.D CONSTRUCTION MANAGER, AT (559) 456-3292, 48 HOURS PRIOR TO CONNECTING TO ANY STORM DRAIN AC ASPHALT CONCRETE EX, EXISTING PB PULL BOX FACILITY. ADD ALT. ADDITIVE ALTERNATE EVC END OF VERTICAL CURVE PCC POINT OF COMPOUND CURVE; CITY OF FRESNO PROJ; CITY OF FRESNO STANDARD; FIRE HYDRANT pa TRAFFIC SIGNAL CABINET =———~——== CURB AND GUTTER t i WORK BY THE CITY.; ces CHne ke GUTTER ibe prepuce a ui ie On eas 5.; wi1-2 35 eo ee nee ei A —_EXISTING SIGN TO BE RELOCATED.; 25, ALL RESURFACING SHALL MATCH EXISTING SURFACES AFTER SIGNAL FACILITIES ARE REMOVED AND/OR RELOCATED.; IN THE EVENT OF ANY DAMAGE, THE CONTRACTOR SHALL REPAIR THE AFFECTED SYSTEMS TO RESTORE FUNCTIONALITY WITHIN THE NEXT BUSINESS DAY.; THE FUSE SHALL BE LOCATED IN THE LUMINAIRE HOUSING AT EACH POLE (5 AMP KTK FUSE IN TRON HEB—AA TYPE FUSE HOLDER).; ANY STREET LIGHT OR TRAFFIC SIGNAL PULL BOX IN THE SCOPE OF WORK OR ACCESSED BY THE CONTRACTOR SHALL BE CLEANED COMPLETELY, GROUTED, AND DUCT SEAL INSTALLED IN CONDUITS..

BID WITH CAUTION 0 red flags detected

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: ABBREVIATIONS: 2. CONTRACTOR WILL NOTIFY F.M.F.C.D CONSTRUCTION MANAGER, AT (559) 456-3292, 48 HOURS PRIOR TO CONNECTING TO ANY STORM DRAIN AC ASPHALT CONCRETE EX, EXISTING PB PULL BOX FACILITY. ADD ALT. ADDITIVE ALTERNATE EVC END OF VERTICAL CURVE PCC POINT OF COMPOUND CURVE; CITY OF FRESNO PROJ; CITY OF FRESNO STANDARD; FIRE HYDRANT pa TRAFFIC SIGNAL CABINET =———~——== CURB AND GUTTER t i WORK BY THE CITY.; ces CHne ke GUTTER ibe prepuce a ui ie On eas 5.; wi1-2 35 eo ee nee ei A —_EXISTING SIGN TO BE RELOCATED.; 25, ALL RESURFACING SHALL MATCH EXISTING SURFACES AFTER SIGNAL FACILITIES ARE REMOVED AND/OR RELOCATED.; IN THE EVENT OF ANY DAMAGE, THE CONTRACTOR SHALL REPAIR THE AFFECTED SYSTEMS TO RESTORE FUNCTIONALITY WITHIN THE NEXT BUSINESS DAY.; THE FUSE SHALL BE LOCATED IN THE LUMINAIRE HOUSING AT EACH POLE (5 AMP KTK FUSE IN TRON HEB—AA TYPE FUSE HOLDER).; ANY STREET LIGHT OR TRAFFIC SIGNAL PULL BOX IN THE SCOPE OF WORK OR ACCESSED BY THE CONTRACTOR SHALL BE CLEANED COMPLETELY, GROUTED, AND DUCT SEAL INSTALLED IN CONDUITS..

Submission deadline

2025-10-16

Red flag teaser

0 red flags detected in this public review.

Locked analysis

Full red flag list with excerpts

0 found

No red flags detected.

Locked analysis

All deadlines table

1 dates
ItemDue
<3 ety 2025-10-16

Locked analysis

Required certifications checklist

1 items
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →