← Public RFP analyses

HARBOR POLICE DEPARTMENT FACILITY ACCESS CONTROL ENHANCEMENTS

This is a public works project for the San Diego Unified Port District to enhance facilities access control at the Harbor Police Department in San Diego, California. The work includes selective demolition, retrofit of doors and gates with new hardware, installation of a card reader security system, and associated electrical and data infrastructure. The project is a renovation/retrofit of an existing facility and requires general construction, electrical, and security system installation trades. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

BID WITH CAUTION 10 red flags detected : SBE Sub-Participation Requirement / Good Faith Effort

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a public works project for the San Diego Unified Port District to enhance facilities access control at the Harbor Police Department in San Diego, California. The work includes selective demolition, retrofit of doors and gates with new hardware, installation of a card reader security system, and associated electrical and data infrastructure. The project is a renovation/retrofit of an existing facility and requires general construction, electrical, and security system installation trades. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

Submission deadline

2025-08-18

Red flag teaser

10 red flags detected including SBE Sub-Participation Requirement / Good Faith Effort.

Locked analysis

Full red flag list with excerpts

10 found

SBE Sub-Participation Requirement / Good Faith Effort

high

NOTE: Respondent acknowledges by signing this form that it is required to complete the SBE Sub-Participation Form acknowledging their good faith effort towards SBE Sub-Participation and/or meet the goal as the prime contractor as a certified SBE (if goal is established).

Advanced Clean Fleet Compliance Required

medium

I acknowledge and agree that I, as the Prime Contractor, and each of my listed Subcontractors, must be registered as a "Compliant Fleet" with the California Air Resources Board ("CARB") at the time of bid submittal, OR that I, and each of my listed Subcontractors, must submit a statement attesting to the fact that I or any Subcontractor are not subject to the High Priority and Federal Fleets regulations in CCR Title 13, §2015 through 2015.6 and the State and Local Government Fleets regulations in CCR Title 13, §2013 through 2013.4.

Bid Bond Required

medium

16. Bid Bond (Form supplied by Contractor's Surety)*** ... *** The signature of the Surety must be acknowledged by a Notary.

Debarment / Past Performance Questionnaire

medium

PLEASE TAKE NOTICE: ANSWERING ANY OF THE FOLLOWING QUESTIONS IN THE POSITIVE MAY CONSTITUTE EVIDENCE REFLECTING UPON THE BIDDER'S RESPONSIBILITY... IF YOUR ANSWER TO QUESTION 5 IS YES, THE DISTRICT SHALL NOT PERMIT YOU TO BID, WORK OR BE AWARDED THIS OR ANY OTHER DISTRICT CONTRACT. FAILURE TO RESPOND TO THESE QUESTIONS MAY BE CONSIDERED A NON-RESPONSIVE BID SUBJECT TO REJECTION.

Illegible Forms May Result in Bid Rejection

medium

These forms are designed to contain essential information concerning the Bidder and the bid, and must be legible. If any of the completed forms are illegible, the District, at its option may declare the entire bid unresponsive.

Locked analysis

All deadlines table

1 dates
ItemDue
Bid Submission Deadline 2025-08-18

Locked analysis

Required certifications checklist

14 items
  • Include bid bond
  • Verify workers compensation coverage
  • Include references or past project experience
  • Verify requirement: Advanced Clean Fleet Requirements Compliance
  • Verify requirement: Americans with Disabilities Act (ADA) Compliance Certificate
  • Verify requirement: Contractor License
  • Verify requirement: False Claims Certification
  • Verify requirement: In-Use Off-Road Diesel-Fueled Fleets Compliance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all