← Public RFP analyses

HABITAT FRIENDLY SHORELINE STRUCTURES HARBOR ISLAND, SAN DIEGO, AND SWEETWATER CHANNEL, CHULA VISTA, CALIFORNIA

This is a public works project for the San Diego Unified Port District involving habitat-friendly shoreline structures at three locations: Harbor Island, San Diego, and Sweetwater Channel in Chula Vista, California. The work includes extensive shoreline construction or restoration with a particular emphasis on the removal and installation of riprap armor stone. The project requires demonstrated experience with environmental compliance, advanced engineering techniques for shoreline and intertidal environments, effective project management, strong safety performance, and innovative or habitat-sensitive construction methods. This is a competitive bid procurement (IFB) for a public agency. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

BID WITH CAUTION 9 red flags detected : Debarment Disqualification — Labor Commissioner Debarment is Absolute Bar

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

This is a public works project for the San Diego Unified Port District involving habitat-friendly shoreline structures at three locations: Harbor Island, San Diego, and Sweetwater Channel in Chula Vista, California. The work includes extensive shoreline construction or restoration with a particular emphasis on the removal and installation of riprap armor stone. The project requires demonstrated experience with environmental compliance, advanced engineering techniques for shoreline and intertidal environments, effective project management, strong safety performance, and innovative or habitat-sensitive construction methods. This is a competitive bid procurement (IFB) for a public agency. Source scope cues include: Bid Bond (Form supplied by Contractor’s Surety)*** ASTERISK NOTES: * Form must be subscribed and sworn to before Notary Public or other Officer. ** These forms shall be.

Submission deadline

2025-12-09

Red flag teaser

9 red flags detected including Debarment Disqualification — Labor Commissioner Debarment is Absolute Bar.

Locked analysis

Full red flag list with excerpts

9 found

Debarment Disqualification — Labor Commissioner Debarment is Absolute Bar

critical

IF YOUR ANSWER TO QUESTION 5 IS YES, THE DISTRICT SHALL NOT PERMIT YOU TO BID, WORK OR BE AWARDED THIS OR ANY OTHER DISTRICT CONTRACT. FAILURE TO RESPOND TO THESE QUESTIONS MAY BE CONSIDERED A NON-RESPONSIVE BID SUBJECT TO REJECTION.

Strict Contractor License Requirement — Non-Responsive Bid if Not Properly Licensed

critical

CALIFORNIA BUSINESS AND PROFESSIONS CODE SECTION 7028.15 PROVIDES THAT EXCEPT AS SPECIFIED THEREIN, THE BID OF A CONTRACTOR WHO IS NOT PROPERLY LICENSED AT THE TIME THE CONTRACTOR SUBMITTED THE BID SHALL BE CONSIDERED NONRESPONSIVE AND SHALL BE REJECTED. SAID CODE SECTION ALSO MAKES IT A MISDEMEANOR TO SUBMIT A BID ON THIS CONTRACT WITHOUT HAVING A PROPER LICENSE.

Advanced Clean Fleet Compliance Required at Bid Time

high

I acknowledge and agree that I, as the Prime Contractor, and each of my listed Subcontractors, must be registered as a "Compliant Fleet" with the California Air Resources Board ("CARB") at the time of bid submittal, OR that I, and each of my listed Subcontractors, must submit a statement attesting to the fact that I or any Subcontractor are not subject to the High Priority and Federal Fleets regulations in CCR Title 13, §2015 through 2015.6 and the State and Local Government Fleets regulations in CCR Title 13, §2013 through 2013.4.

SBE Sub-Participation Requirement / Goal

high

NOTE: Respondent acknowledges by signing this form that it is required to complete the SBE Sub-Participation Form acknowledging their good faith effort towards SBE Sub-Participation and/or meet the goal as the prime contractor as a certified SBE (if goal is established). In the event of a discrepancy between form and totals entered on the eBid system, the District reserves the right to evaluate and waive any informalities.

Subcontractor Listing and Compliance Required

high

Note: List the following information for all subcontractors who are required to be listed by the Subletting and Subcontracting Fair Practices Act, Section 4100, et seq., California Public Contract Code. (Also see Paragraphs 4.1.6 and 5.4.1) For each subcontractor listed, you must include all required information.

Locked analysis

All deadlines table

1 dates
ItemDue
Bid Submission Deadline 2025-12-09

Locked analysis

Required certifications checklist

16 items
  • Include bid bond
  • Verify workers compensation coverage
  • Verify requirement: Advanced Clean Fleet Requirements Compliance Certificate
  • Verify requirement: Americans with Disabilities Act (ADA) Compliance Certificate
  • Verify requirement: Contractor License
  • Verify requirement: False Claims Certification
  • Verify requirement: In-Use Off-Road Diesel-Fueled Fleets Compliance Certificate
  • Verify requirement: Non-Collusion Affidavit

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all