Greg Avenue Pressure Control Structure - Pump Modification and New Control Building

Source scope cues include: City of Burbank; City of Burbank cannot be; sealed proposal; 25-year warranty against defects in material and workmanship. 2.06 SAFETY POST A. A safety post shall be installed on the fixed ladder b; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Water Treatment Plant; 7551 Greg Avenue, Sun Valley, CA; 75 Hawthorne Street; Electrical Contractors; plumbing contractor.

BID WITH CAUTION 20 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Burbank; City of Burbank cannot be; sealed proposal; 25-year warranty against defects in material and workmanship. 2.06 SAFETY POST A. A safety post shall be installed on the fixed ladder b; Data and information made available in these documents are for the bidder's information.; responsibility for any interpretation of or conclusion drawn from the data or information by the bidder.; forms provided by Metropolitan, and shall be supplemented by such other data as the Engineer may require.; substantiated by valid copies of vendor's invoices.; necessary attachments, repairs and maintenance of all kinds, depreciation, storage, insurance, and all incidentals.; special services in lieu of itemized invoices.; 5 percent will be added to invoices for special services.; Supporting data is subject to audit in accordance with Article 12.; final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work.; subsequent replacement, as directed and approved by the Engineer.; Water Treatment Plant; 7551 Greg Avenue, Sun Valley, CA; 75 Hawthorne Street; Electrical Contractors; plumbing contractor.

Submission deadline

Not listed in the public preview.

Red flag teaser

20 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

20 found

Back-Charge / Setoff Rights

high

…tions. 4. The Contractor shall replace MFE that is lost or damaged after transfer to the Contractor, or at the Engineer’s option, be back-charged for repairs or replacement. The Contractor shall be charged for MFE that is not used in the work and is not returned to Metropolitan. E. MFE shall not be left unguarded at the jobsite. MFE shall not be stored overnight at the jobsite unless security is

Broad Indemnification

high

…from all claims of any kind arising directly or indirectly out of the performance of the work. (f) Indemnity. — The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind which may arise from or in connection with MWD Standard Document 00700-12 MS October 14, 2016

Hazardous Material / Abatement Coordination

high

…or Material 60. Differing or Unusual Site Conditions 27. Right of Property in Materials 61. Hazardous Substance, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 3

Liquidated Damages

high

…e, Hazardous Waste, or Asbestos- 28. Title to Materials Found on the Work Related Work 29. Access to Work 62. Hazardous Material 30. Liquidated Damages 63. Hazardous Waste 31. Patents and Copyrights 64. Insurance 32. No Payment for Temporary or Preliminary Works 65. Payrolls and Records 33. Partial Estimates 66. Non-Use of Intellectual Property of Third Parties 34. Partial Estimates May Be Withhe

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records it is requ

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

22 items
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda
  • Include W-9 or taxpayer information

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all