Back-Charge / Setoff Rights
high…tions. 4. The Contractor shall replace MFE that is lost or damaged after transfer to the Contractor, or at the Engineer’s option, be back-charged for repairs or replacement. The Contractor shall be charged for MFE that is not used in the work and is not returned to Metropolitan. E. MFE shall not be left unguarded at the jobsite. MFE shall not be stored overnight at the jobsite unless security is