← Public RFP analyses

General Contractor Services at Del Rio Trail Cycle 1

Source scope cues include: CITY OF SACRAMENTO; CITY OF SACRAMENTO DPW IMPROVEMENT; CONNECTIONS SHALL BE MECHANICALLY FASTENED.; UNLESS SIGNED AND SEALED BY A LICENSED DESIGN PROFESSIONAL.; REPAIR METHOD IS ACCEPTABLE FROM AN AESTHETIC PERSPECTIVE.; MAY REQUIRE A REPLACEMENT ASSEMBLAGE..

BID WITH CAUTION 5 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF SACRAMENTO; CITY OF SACRAMENTO DPW IMPROVEMENT; CONNECTIONS SHALL BE MECHANICALLY FASTENED.; UNLESS SIGNED AND SEALED BY A LICENSED DESIGN PROFESSIONAL.; REPAIR METHOD IS ACCEPTABLE FROM AN AESTHETIC PERSPECTIVE.; MAY REQUIRE A REPLACEMENT ASSEMBLAGE..

Submission deadline

Not listed in the public preview.

Red flag teaser

5 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

5 found

Broad Indemnification

high

22. INSTALLER SHALL DEFEND, HOLD HARMLESS AND INDEMNIFY SGS, ITS OFFICERS AND EMPLOYEES, AND EACH AND EVERY ONE OF THEM, FROM AND AGAINST ANY AND ALL CLAIMS, ACTIONS, DAMAGES, COSTS. LIABILITIES, DEMANDS, LOSSES, JUDGMENTS, PENALTIES AND EXPENSES OF EVERY TYPE AND DESCRIPTION, INCLUDING, BUT NOT LIMITED TO, ANY FEES AND/OR COSTS REASONABLY INCURRED BY SGS STAFF ATTORNEYS OR OUTSIDE ATTORNEYS AND A

Federal Funding Compliance (ARPA / CDBG / HUD / FEMA / 2 CFR 200)

high

. RAIN INTENSITY = 1.5 IN/HOUR FEMA FLOOD ZONE X

No Material Substitutions Without Owner Approval

high

…SACRAMENTO DEL RIO TRAIL PROJECT. AVIAN GANTRY STRUCTURES SHALL BE CONSTRUCTED BY THE INSTALLER UTILIZING SGS-PROVIDED PREFABRICATED SCULPTED ASSEMBLAGES (HENCEFORTH "ASSEMBLAGES" ), ASSEMBLAGES, AVIAN GANTRY STRUCTURES, AND THEIR LOCATIONS, 4RE ALL DESCRIBED IN THIS DOCUMENT. SGS IS THE PROJECT ARTIST, NO SUBSTITUTIONS ARE ALLOWED AND NO OTHER PARTY SHALL BE CONTRACTED TO SUPPLY THE ASSEMBLAGES.

Prevailing Wage / Certified Payroll

high

…MPENSATION, AND BUILDER’S RISK INSURANCE), INSTALLER SHALL FURTHER BE KNOWLEDGEABLE WITH AND FULLY COMPLY WITH THE CITY AND STATE’?S PREVAILING WAGES REQUIREMENTS, AND PROVIDE ALL NECESSARY DOCUMENTATIONS ASSOCIATED WITH SUCH REQUIREMENTS. INSTALLER SHALL BE KNOWLEDGEABLE OF AND IN FULL COMPLIANCE WITH THE “CALTRANS CLEAN ACT GRANT PROGRAM CONDITIONS", AND SHALL SUBMIT ANY REQUIRED ASSOCIATED DOC

Contractor Responsible for All Permits

medium

11. UNLESS EXPLICITLY AGREED UPON IN WRITING IN ADVANCE BY THE CITY, SGS, AND THE INSTALLER; INSTALLER IS RESPONSIBLE FOR ALL PERMITS, REVIEWS, ON-SITE INSPECTIONS, AND ASSOCIATED FEES.

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

5 items
  • Verify general liability insurance limits
  • Verify requirement: Commercial General Liability Insurance
  • Verify requirement: Workers Compensation Insurance
  • Verify requirement: Prevailing Wage Compliance
  • Resolve before bid: Prevailing Wage / Certified Payroll

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all