Gene Wash Reservoir Discharge Valve Replacement

Source scope cues include: Department of General Services; planetbids.com/portal/portal; sealed proposal; language, and all numerical data furnished shall use the foot-pound-second system of units of measurement.; Faithful Performance,” equal to 100 percent of the bid, exclusive of the amount allocated to services.; by Metropolitan using the data of Document 00126, “Equalizing Factors for Inspection.; issued by the local jurisdiction in which they are located.; determining such costs or time, or both, and all other pertinent factual data.; articles to effectively avoid any unnecessary damage, repair or faulty production.; American Society of Mechanical Engineers, as applicable to the class and nature of articles or materials considered.; materials repaired instead of replaced, at the Contractor's expense.; price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; schedules, product data, drawings, schematic wiring diagrams, and similar items.; Supporting data (calculations, test results, etc.; Maintenance Manuals: Describe fully all aspects of preventive and repair maintenance.; 15800 MWD Road, Parker Dam, California.

BID WITH CAUTION 9 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Department of General Services; planetbids.com/portal/portal; sealed proposal; language, and all numerical data furnished shall use the foot-pound-second system of units of measurement.; Faithful Performance,” equal to 100 percent of the bid, exclusive of the amount allocated to services.; by Metropolitan using the data of Document 00126, “Equalizing Factors for Inspection.; issued by the local jurisdiction in which they are located.; determining such costs or time, or both, and all other pertinent factual data.; articles to effectively avoid any unnecessary damage, repair or faulty production.; American Society of Mechanical Engineers, as applicable to the class and nature of articles or materials considered.; materials repaired instead of replaced, at the Contractor's expense.; price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; schedules, product data, drawings, schematic wiring diagrams, and similar items.; Supporting data (calculations, test results, etc.; Maintenance Manuals: Describe fully all aspects of preventive and repair maintenance.; 15800 MWD Road, Parker Dam, California.

Submission deadline

2016-04-14

Red flag teaser

9 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

9 found

Broad Indemnification

high

…be made and become effective at the time the District tenders final payment to the bidder. 27. Indemnity. — (a) The Contractor shall indemnify and save harmless the District, the Board, each member of the Board, and the District's officers, agents, and employees, from all liability and claims of any kind, arising out of or in connections with work to be performed, including but not limited to: (1

Liquidated Damages

high

…ment Forbidden 20. Access to Places of Manufacture 7. Suspension of Contract 21. Shipment 8. Additional Surety 22. Payment 9. Delays-Liquidated Damages 23. Sales and Use Taxes 10. Authority of the Engineer 24. Moneys May Be Retained 11. Changes 25. Federal Law and Regulations 12. Extra Work 26. Assignment of Causes of Action 13. Contractor’s Obligations 27. Indemnity 14. Responsibility for Articl

Differing / Unknown Site Conditions (Contractor Risk)

medium

…t, such changes shall be ordered and paid for as extras, as hereinafter provided in Article 12. (c) If the Contractor, on account of unforeseen conditions, finds it impracticable to comply strictly with these specifications, and applies in writing for a modification of the designs or requirements, such change may be authorized by the Engineer if not detrimental to the product and without extra co

High Insurance Limits Required

medium

…ees on-site $100,000 1 — 50 $300,000 51 — 100 $1,000,000 over 100 (c) If required, auto insurance coverage shall be in the amount of $1,000,000 combined single limit. (d) Insurance required by the provisions of this document shall be issued by an insurance organization approved by Metropolitan and holding a certificate of authority from the Insurance Commissioner of the State of California admitt

MBE/WBE/DBE Participation Requirement

medium

…e area click on the following link: http://www.mwdh2o.com/PDF_NewsRoom/6.4.2_Maps_MemberAgencies.pdf b. A Small Business Enterprise (SBE) is independently owned and operated; is not dominant in its field; and meets the criteria set forth by the Small Business Administration in Title 13, Code of Federal Regulations, Part 121. c. A Disabled Veteran Business Enterprise (DVBE) is independently owned

Locked analysis

All deadlines table

1 dates
ItemDue
Project Award 2016-04-14

Locked analysis

Required certifications checklist

11 items
  • Include performance bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include W-9 or taxpayer information
  • Include references or past project experience
  • Include safety documents if required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all