GARNER 6 AND GARNER D WATER WELLS ELECTRICAL EQUIPMENT MODERNIZATION PROJECT

Source scope cues include: CITY OF RIVERSIDE PUBLIC UTILITIES; CITY OF RIVERSIDE CONTRACTOR CUSTOMER; bid security shall be uploaded via the Bidding Website prior to bid event date and time as instructed in the Notice Inviting Bids. Scans of notarized bid bonds will be acce; ), and mechanical devices (valves, pumps, etc.; Board - The City of Riverside Board of Public Utilities.; RPU - The City of Riverside Public Utilities Department.; NO HARD COPY OR EMAILED BIDS WILL BE ACCEPTED.; Contractor shall provide proof to City that notifications have been made (i.; the Contractor has obtained the necessary permits.; those permits obtained from the City of Riverside Public Works Department.; Permits issued by jurisdictional regulatory agencies.; business licenses, permits, insurances and procedure plans.; 00 per linear foot of relocated sewer.; and shall repair same at Contractor’s expense.; 3-13 COMPLETION, ACCEPTANCE AND WARRANTY.; effect on the day the Notice Inviting Sealed Proposals (Bids) is dated.; 3900 Main Street, Riverside CA; 2431 Sixth Street, and it is in the City of San Bernardino to the; 3900 Main Street, Riverside, which schedule is open for inspection to any interested party on request. The Contractor and all; electrical contractor.

BID WITH CAUTION 20 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: CITY OF RIVERSIDE PUBLIC UTILITIES; CITY OF RIVERSIDE CONTRACTOR CUSTOMER; bid security shall be uploaded via the Bidding Website prior to bid event date and time as instructed in the Notice Inviting Bids. Scans of notarized bid bonds will be acce; ), and mechanical devices (valves, pumps, etc.; Board - The City of Riverside Board of Public Utilities.; RPU - The City of Riverside Public Utilities Department.; NO HARD COPY OR EMAILED BIDS WILL BE ACCEPTED.; Contractor shall provide proof to City that notifications have been made (i.; the Contractor has obtained the necessary permits.; those permits obtained from the City of Riverside Public Works Department.; Permits issued by jurisdictional regulatory agencies.; business licenses, permits, insurances and procedure plans.; 00 per linear foot of relocated sewer.; and shall repair same at Contractor’s expense.; 3-13 COMPLETION, ACCEPTANCE AND WARRANTY.; effect on the day the Notice Inviting Sealed Proposals (Bids) is dated.; 3900 Main Street, Riverside CA; 2431 Sixth Street, and it is in the City of San Bernardino to the; 3900 Main Street, Riverside, which schedule is open for inspection to any interested party on request. The Contractor and all; electrical contractor.

Submission deadline

Not listed in the public preview.

Red flag teaser

20 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

20 found

Back-Charge / Setoff Rights

high

owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether such amount is owed to City, City will hold such disputed amount

Broad Indemnification

high

…is hereby relieved at all times from any indebtedness or claim other than payments under terms of the Contract. The Contractor will indemnify and hold harmless the City and its officers and employees from any loss, demand, damages, claims or actions arising from or in connection with said indebtedness. 3-2 SELF PERFORMANCE. There are no "Specialty Items" on this project. 3-3 SUBCONTRACTORS. Add t

Liquidated Damages

high

…atory agencies to install such BMP's. Each 24 hour period elapsed without installation of the required BMPs by the Contractor will be considered an incident. Failure of the Contractor to meet the 24 hour period for installing the required BMPs may cause damages to the City and the Contractor shall be assessed additional liquidated damages as described in Section 6-9 of these Special Provisions. 2

Mandatory Contractor License / Nonresponsive Proposal

high

…lectrical motor starter for Potable Water Booster Station or Potable Water Well. Such experience shall be under the Bidder’s current C-10 contractor’s license and company name. Bidders Company Name: Address: Years of experience: 5. The Bidder (Contractor) shall have, at the time of submission, completed at least two (2) electrical motor starter projects 150 Horse Power (HP) or larger in size for

Mandatory Pre-Bid / Pre-Proposal Meeting

high

…t Award. The basis of award will be to the lowest responsive and responsible Bidder for the total bid. (MS TEAMS OPTION) 1-6.1.2 Non-Mandatory Pre-Bid Conference. All Prospective Bidders are highly encouraged to attend a virtual non-mandatory pre-bid conference as described in the Notice Inviting Bids. 1-6.1.3 Examination of Work Site, Proposal Forms, Plans, and Specifications. The Bidder is requ

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

24 items
  • Include bid bond
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all