Gage Canal Multi-Purpose Recreational Trail

Source scope cues include: City of Riverside; City of Riverside standards; Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; Replacements, Repairs, Guarantees and Warranty Work.; Supervision of a Licensed Pest Control Advisor who is licensed in the State of California.; Repair any and all damage to the turf that may occur.; repaired on an as-needed basis using new replacement parts to match existing.; replacement of all improvements that may become damaged as a result including all erosion.; 03 UTILITIES: All known underground utilities are noted on the Plans.; Existing Inactive/Abandoned Utilities: All miscellaneous inactive underground facilities (e.; Erosion Repairs, Guarantees and Warranty Work.; immediate and proper notification of the damage to the utility owner so that repairs can be made.; Contractor shall cooperate with the utility owner and provide access for repair work.; necessary to protect such utilities and structures from damage.; Replacement of Surface Improvements: Add the following to Standard Specifications Section 306-1.; Product Data: For each type of product indicated.; 18540 Minthorn Street, Lake Elsinore, CA; 14111 Scottslawn Road, Marysville, Ohio.

BID WITH CAUTION 8 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: City of Riverside; City of Riverside standards; Product Data, Samples, Record Documents, Shop Drawing, etc.; Plumbing, Electrical Lighting, Concrete, HVAC, etc.; standard printed data is not suitable for use, submit as "Shop Drawings.; Replacements, Repairs, Guarantees and Warranty Work.; Supervision of a Licensed Pest Control Advisor who is licensed in the State of California.; Repair any and all damage to the turf that may occur.; repaired on an as-needed basis using new replacement parts to match existing.; replacement of all improvements that may become damaged as a result including all erosion.; 03 UTILITIES: All known underground utilities are noted on the Plans.; Existing Inactive/Abandoned Utilities: All miscellaneous inactive underground facilities (e.; Erosion Repairs, Guarantees and Warranty Work.; immediate and proper notification of the damage to the utility owner so that repairs can be made.; Contractor shall cooperate with the utility owner and provide access for repair work.; necessary to protect such utilities and structures from damage.; Replacement of Surface Improvements: Add the following to Standard Specifications Section 306-1.; Product Data: For each type of product indicated.; 18540 Minthorn Street, Lake Elsinore, CA; 14111 Scottslawn Road, Marysville, Ohio.

Submission deadline

Not listed in the public preview.

Red flag teaser

8 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

8 found

Back-Charge / Setoff Rights

high

…pleting previously noted corrections, or without preparing the system for inspection, the inspection may be cancelled and Contractor back charged for the direct costs of all City personnel time and consultant time lost, at the discretion of the Parks Department Representative. E. Closing in Uninspected Work: Do not allow or cause any of the Work of this Section to be covered up or enclosed until

Hazardous Material / Abatement Coordination

high

…e deflection of the pipe at each coupling (2-1/2 degrees each side) without ex-filtration or infiltration, cracking or breaking." C. Asbestos Cement Pipe (ACP): Add the following to Standard Specifications Section 212-2.1.6 Asbestos Cement Pipe and Fittings: (Note: Installation of new ACP shall not be a part of the project. This specification information is provided in the event connections to ex

Liquidated Damages

high

…t Representative. If such suspension of the Plant Establishment Period occurs and extends beyond a maximum of 15 calendar days, then liquidated damages may be assessed for each calendar day where suspension of the establishment continues.” 3.14 MAINTENANCE TASKS: Add the following to Standard Specifications Section 308-6 MAINTENANCE AND PLANT ESTABLISHMENT: “308-6.3 MAINTENANCE A. General: During

No Material Substitutions Without Owner Approval

high

…cified herein this Section shall be reviewed and approved by the Parks Department Representative, in writing, prior to the Bid Date. No substitutions shall be allowed after the Bid Date. 1.4 COORDINATION A. Contractor shall coordinate the installation of signage in this Section with other related Work. B. Contractor shall be responsible for verifying the dimensions and required hardware of the fu

Extended Warranty (> 1 Year)

medium

…e an automatic self test when batteries are connected as the only required commissioning step. No user configuration is required. M. 5 Year Warranty 1. All materials and component parts, including batteries (where applicable), are guaranteed to be free from defects of material and/or workmanship for a period of five years. FLT assumes no responsibility for installation or proper selection of its

Locked analysis

All deadlines table

0 dates
ItemDue
No deadlines detected.

Locked analysis

Required certifications checklist

4 items
  • Include performance bond
  • Verify workers compensation coverage
  • Include references or past project experience
  • Resolve before bid: Performance Bond Required

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all