Furnishing Two Polyethylene Tanks for Fluorosilicic Acid at Joseph Jensen Water Treatment Plant

Source scope cues include: Metropolitan using the data in Document 00126, Equalizing Factors for Inspection.; example below depicts how Metropolitan will use bid data from responsible bidders to determine the lowest responsive bid.; specially prepared for the work of the Contract shall be submitted as Shop Drawings, not as Product Data.; Engineer, along with a hard copy of the letter of transmittal.; PDF and similarly tabbed in the hard copy, when a hard copy is specified.; or mechanical engineer currently registered in the State of California.; be submitted in accordance with Section 01730, Operations and Maintenance Data.; Recommended components needed to comply with warranty requirements.; invoices, bills of lading, and shipping lists on all articles and materials for use on the work.; The Contractor shall provide the type, quantity and size of tanks shown in the data sheets and drawings.; Each tank shall have a nominal capacity as shown on the data sheet and the drawings.; Flanged type top and side manways: mechanically attached side manways shall be not accepted.; retain the tanks 5-year manufacturer’s warranty.; Skirt shall be fabricated from a vinyl ester resin and fiber mat.; Be in accordance with these specifications, data sheets, and as shown on the drawings.; Ladder and safety deck shall be constructed of fiberglass reinforced plastic (FRP).; Water Treatment Plant.

BID WITH CAUTION 3 red flags detected : Liquidated Damages

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Metropolitan using the data in Document 00126, Equalizing Factors for Inspection.; example below depicts how Metropolitan will use bid data from responsible bidders to determine the lowest responsive bid.; specially prepared for the work of the Contract shall be submitted as Shop Drawings, not as Product Data.; Engineer, along with a hard copy of the letter of transmittal.; PDF and similarly tabbed in the hard copy, when a hard copy is specified.; or mechanical engineer currently registered in the State of California.; be submitted in accordance with Section 01730, Operations and Maintenance Data.; Recommended components needed to comply with warranty requirements.; invoices, bills of lading, and shipping lists on all articles and materials for use on the work.; The Contractor shall provide the type, quantity and size of tanks shown in the data sheets and drawings.; Each tank shall have a nominal capacity as shown on the data sheet and the drawings.; Flanged type top and side manways: mechanically attached side manways shall be not accepted.; retain the tanks 5-year manufacturer’s warranty.; Skirt shall be fabricated from a vinyl ester resin and fiber mat.; Be in accordance with these specifications, data sheets, and as shown on the drawings.; Ladder and safety deck shall be constructed of fiberglass reinforced plastic (FRP).; Water Treatment Plant.

Submission deadline

2025-03-05

Red flag teaser

3 red flags detected including Liquidated Damages.

Locked analysis

Full red flag list with excerpts

3 found

Liquidated Damages

high

…a procurement contract? If yes, attach a separate sheet with a detailed explanation. Yes: __________ No: __________ c. Been assessed liquidated damages under a procurement contract? If yes, attach a separate sheet with a detailed explanation. Yes: __________ No: _________ a. Committed, through its acts or omissions, any one or more of the violations listed in Section 6 of Document 00100, Instruct

MBE/WBE/DBE Participation Requirement

medium

…ion of the source of any inquiry. Questions regarding this project shall be emailed to SpecsDesk@mwdh2o.com. 2. Reduction Credit for SBE, DVBE and RBE - Where applicable, a 5-percent reduction credit for SBE or DVBE and a 5- percent reduction credit for RBE will be applied to the total bid price for the purpose of evaluating the bid as specified in Document 00130. Maximum reduction credit shall n

Owner Right to Reject All Bids

low

…e 1 or 2 and all the work included in the specifications. Metropolitan reserves the right to waive any informality in any bid, or to reject any or all bids. Any bid which, in the opinion of the Engineer, is so unbalanced between the various contract items as to be detrimental to interests of Metropolitan will be rejected. 6. Bid Evaluation Example - Metropolitan will use the data and information

Locked analysis

All deadlines table

1 dates
ItemDue
of Document 00100, Instructions to Bidders, on or before 2:00 p.m., 2025-03-05

Locked analysis

Required certifications checklist

5 items
  • Acknowledge all addenda
  • Include references or past project experience
  • Include safety documents if required
  • Submit through the e-procurement / online bid system
  • Track deadline: of Document 00100, Instructions to Bidders, on or before 2:00 p.m.,

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →