← Public RFP analyses

Furnishing Steel Pipe for Etiwanda Pipeline North Relining Stage 3

Source scope cues include: Department of General Services; planetbids.com/portal/portal; Metropolitan using the data in Document 00126, Equalizing Factors for Inspection.; issued by the local jurisdiction in which they are located.; determining such costs or time, or both, and all other pertinent factual data.; price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; California, of invoice and receipted original bill of lading covering said unit and appurtenances.; Contractor and accepted by the Engineer, and the associated invoice is received by Metropolitan.; The Contractor shall obtain permits required for hauling finished materials to Etiwanda Reservoir.; permits shall be submitted to Metropolitan a week prior to start of hauling.; activate the warranty period specified in Section 01740.; and include product data on materials used to cover the coal tar coating.; application and again prior to installation and any damaged areas shall be repaired.; As-built drawings: Hard copy and electronic PDF drawings shall be submitted.; along with a hard copy of the letter of transmittal.; 8248 Etiwanda Avenue, Rancho Cucamonga, CA; Electrical Contractors; Roofing Contractors.

BID WITH CAUTION 8 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Department of General Services; planetbids.com/portal/portal; Metropolitan using the data in Document 00126, Equalizing Factors for Inspection.; issued by the local jurisdiction in which they are located.; determining such costs or time, or both, and all other pertinent factual data.; price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; California, of invoice and receipted original bill of lading covering said unit and appurtenances.; Contractor and accepted by the Engineer, and the associated invoice is received by Metropolitan.; The Contractor shall obtain permits required for hauling finished materials to Etiwanda Reservoir.; permits shall be submitted to Metropolitan a week prior to start of hauling.; activate the warranty period specified in Section 01740.; and include product data on materials used to cover the coal tar coating.; application and again prior to installation and any damaged areas shall be repaired.; As-built drawings: Hard copy and electronic PDF drawings shall be submitted.; along with a hard copy of the letter of transmittal.; 8248 Etiwanda Avenue, Rancho Cucamonga, CA; Electrical Contractors; Roofing Contractors.

Submission deadline

2016-04-14

Red flag teaser

8 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

8 found

Broad Indemnification

high

…be made and become effective at the time Metropolitan tenders final payment to the bidder. 27. Indemnity. — (a) The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind, arising out of or in connections with work to be performed, including but not limited to: (1

Hazardous Material / Abatement Coordination

high

…Unless otherwise specified or shown on the drawings, gaskets for flanged joints shall be full-face gaskets made of a compressed non-asbestos and rubber compound. The composite gasket material shall be in accordance with UL 157 for Type V gaskets. a. Gaskets shall be 1/16 inch thick for pipe sizes up to 24 inches and 1/8 inch thick for pipe sizes 26 inches and greater. b. Gaskets for flanges up to

Liquidated Damages

high

…a procurement contract? If yes, attach a separate sheet with a detailed explanation. Yes: __________ No: __________ c. Been assessed liquidated damages under a procurement contract? If yes, attach a separate sheet with a detailed explanation. Yes: __________ No: __________ 8. Give the following information for the manufacturer or manufacturers of the steel pipe: a. Manufacturer’s name and mailing

Differing / Unknown Site Conditions (Contractor Risk)

medium

…t, such changes shall be ordered and paid for as extras, as hereinafter provided in Article 12. (c) If the Contractor, on account of unforeseen conditions, finds it impracticable to comply strictly with these specifications, and applies in writing for a modification of the designs or requirements, such change may be authorized by the Engineer if not detrimental to the product and without extra co

High Insurance Limits Required

medium

…general liability coverage shall be in the amount of $1,000,000. (c) If required, auto insurance coverage shall be in the amount of $1,000,000 combined single limit. (d) If required, the Contractor shall provide workers’ compensation insurance that is in accordance with State of California statutory requirements and shall include Employer’s Liability coverage of $1,000,000 per accident for bodily

Locked analysis

All deadlines table

1 dates
ItemDue
Project Award 2016-04-14

Locked analysis

Required certifications checklist

10 items
  • Include performance bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include references or past project experience
  • Include safety documents if required
  • Verify requirement: Commercial General Liability Insurance

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all