Fresno-Clovis Regional Wastewater Reclamation Facility Training Building Abatement and Roof Replacement

Source scope cues include: ABATEMENT AND ROOF REPLACEMENT BID FILE NO. 12600026; City of Fresno is soliciting; City of Fresno; PREVAILING WAGE The work hereunder constitutes a “public work” as defined in the California Labor Code, Division 2, Part 7, Chapter 1 (; ASBESTOS SURVEY REPORT TRAINING BUILDING NORTH 5607 W. JENSEN AVENUE FRESNO, CALIFORNIA ______________________________________________________________________________ INTRODUCTI...; Building Abatement and Roof Replacement.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; invoices submitted must contain all information and supporting documentation required by the contract.; in a Resolution setting forth facts constituting the emergency or necessity.; construction of a building, or renovation of, or addition to, an existing building.; additional insured for all ongoing and completed operations.; submittals are approved, and permits issued in order for the work to commence.; support for reimbursement payment vouchers or invoices sent to or paid by the City.; in the Labor Code for violation of prevailing wage rates.; invoices of the Mediator actually billed to Owner by Contractor.; otherwise in Specifications or required permits.; WATER TREATMENT PLANT; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; roofing Contractor.

BID WITH CAUTION 17 red flags detected : Back-Charge / Setoff Rights

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: ABATEMENT AND ROOF REPLACEMENT BID FILE NO. 12600026; City of Fresno is soliciting; City of Fresno; PREVAILING WAGE The work hereunder constitutes a “public work” as defined in the California Labor Code, Division 2, Part 7, Chapter 1 (; ASBESTOS SURVEY REPORT TRAINING BUILDING NORTH 5607 W. JENSEN AVENUE FRESNO, CALIFORNIA ______________________________________________________________________________ INTRODUCTI...; Building Abatement and Roof Replacement.; Contractor shall provide complete and accurate billing invoices in order to receive payment.; invoices submitted must contain all information and supporting documentation required by the contract.; in a Resolution setting forth facts constituting the emergency or necessity.; construction of a building, or renovation of, or addition to, an existing building.; additional insured for all ongoing and completed operations.; submittals are approved, and permits issued in order for the work to commence.; support for reimbursement payment vouchers or invoices sent to or paid by the City.; in the Labor Code for violation of prevailing wage rates.; invoices of the Mediator actually billed to Owner by Contractor.; otherwise in Specifications or required permits.; WATER TREATMENT PLANT; 2600 Fresno Street; 2600 Fresno Street, Fresno, California; roofing Contractor.

Submission deadline

2025-09-25

Red flag teaser

17 red flags detected including Back-Charge / Setoff Rights.

Locked analysis

Full red flag list with excerpts

17 found

Back-Charge / Setoff Rights

high

…or. As an alternative to payment of such claims or obligations, City, in its sole discretion, may reduce the total Contract price or set-off the amount against payments due. WAIVER AND RELEASE FORMS Consistent with the provisions of California Civil Code Chapter 3 – Waiver and Release [8120 – 8138], the Contractor and its subcontractors shall promptly furnish the City with a release of all claims

Broad Indemnification

high

…m the date of bid opening. If the City determines that a tiebreaker is necessary, each applicable Bidder agrees to participate or to indemnify the City in any litigation resulting from the utilization of the tiebreaker. If a Bidder refuses to timely participate, the City shall conduct the coin toss in a manner determined by the City to be fair to all and the results of such coin toss shall be fin

Hazardous Material / Abatement Coordination

high

…,000 2. Lump Sum Mediator (Owner’s 50% share, see 2.22 Lump Sum $ **2,000 of General Conditions) 3. Lump Sum Removal and Disposal of Asbestos Felt Lump Sum $ Underlayment and Asbestos Roof Penetration Mastic 4. Lump Sum Demolition and Disposal of Existing Lump Sum $ Roof System and Wood Shake Wall Finish 5. 3500 SF Thermoplastic Membrane Roofing $ $ System Installation at the Training Building Ro

Lien Waiver / Waiver of Lien Rights

high

…he Contract Documents; or (iii) terms of special warranties required by the Contract Documents. Contractor shall promptly provide an unconditional waiver and release upon final payment in accordance with California Civil Code section 3262 and these Contract Documents. Except to the extent of any Claim arising from City’s sole or active negligence, and except to the extent Contractor expressly des

Liquidated Damages

high

Bidder’s Name: (Submit with bid proposal) TIME OF COMPLETION/LIQUIDATED DAMAGES The Contractor shall diligently prosecute the work to completion for all bid items before the expiration of ONE HUNDRED FIFTY (150) working days from the date of the Notice to Proceed. It is agreed that the Contractor shall be liable for and shall pay to the City, as fixed, and agreed, liquidated damages, and not as a…

Locked analysis

All deadlines table

1 dates
ItemDue
A pre-bid conference will be held at 9:00 a.m., on 2025-09-25

Locked analysis

Required certifications checklist

22 items
  • Complete bid/proposal form
  • Include performance bond
  • Include payment bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Include contractor license information
  • Acknowledge all addenda

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all