← Public RFP analyses

For Furnishing Electrical Panels for Robert B. Diemer Treatment Plant

Source scope cues include: Department of General Services; planetbids.com/portal/portal; language, and all numerical data furnished shall use the foot-pound-second system of units of measurement.; information and data suitable for Metropolitan to verify full compliance with the requirements of the specifications.; issued by the local jurisdiction in which they are located.; pertinent factual data necessary to evaluate the claim.; Supporting data is subject to audit in accordance with Article 12.; description, unit price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; maintenance, repair, and replacement service will be indicated.; furnish at the Contractor's expense additional data about the proposed substitute.; Work Not Included: The panelboard enclosure in not included in the scope of this contract.; The proposed substitution is conspicuously marked on the drawings or data.; Proof is provided of the comparative quality and suitability of alternative equipment or materials.; Houston; 1500 King Street, Suite; 1916 Race Street; Electrical Contractors.

BID WITH CAUTION 10 red flags detected : Broad Indemnification

Free RFP preview

The quick read before you decide to bid

Bid/no-bid recommendation

BID WITH CAUTION

Scope summary

Source scope cues include: Department of General Services; planetbids.com/portal/portal; language, and all numerical data furnished shall use the foot-pound-second system of units of measurement.; information and data suitable for Metropolitan to verify full compliance with the requirements of the specifications.; issued by the local jurisdiction in which they are located.; pertinent factual data necessary to evaluate the claim.; Supporting data is subject to audit in accordance with Article 12.; description, unit price, and value of the articles invoiced.; (c) All invoices covering shipments where prices are named f.; California, of invoice and receipted original bill of lading covering said articles and materials.; maintenance, repair, and replacement service will be indicated.; furnish at the Contractor's expense additional data about the proposed substitute.; Work Not Included: The panelboard enclosure in not included in the scope of this contract.; The proposed substitution is conspicuously marked on the drawings or data.; Proof is provided of the comparative quality and suitability of alternative equipment or materials.; Houston; 1500 King Street, Suite; 1916 Race Street; Electrical Contractors.

Submission deadline

2016-04-14

Red flag teaser

10 red flags detected including Broad Indemnification.

Locked analysis

Full red flag list with excerpts

10 found

Broad Indemnification

high

…be made and become effective at the time Metropolitan tenders final payment to the bidder. 27. Indemnity. — (a) The Contractor shall indemnify and save harmless Metropolitan, the Board, each member of the Board, and Metropolitan's officers, agents, and employees, from all liability and claims of any kind, arising out of or in connections with work to be performed, including but not limited to: (1

Liquidated Damages

high

…d shall be forfeited, cashed, or enforced as appropriate. The money available therefrom shall become the property of Metropolitan as liquidated damages for such failure or refusal. If the successful bidder complies with the foregoing requirements in a timely manner, the bidder’s security, if furnished, shall be returned to the bidder within 5 days of Contract execution, or the bid bond, if furnis

Prevailing Wage / Certified Payroll

high

…th state or federal laws or regulations pertaining to labor and employment standards, including those involving workplace safety and prevailing wages; f. Falsification of any document relating to a bid in response to a solicitation by Metropolitan for the procurement of goods and services or a public work contract entered into; g. Concealment, withholding, and/or destruction of records he or she

Subcontractor Pre-Approval Required

high

…r provided, a revised schedule of progress may be required in accordance with such extension of time. 6. Assignment Forbidden. — The Contractor shall not assign, transfer, convey, sublet, or otherwise dispose of this contract or of his right, title, or interest in or to the same or any part thereof, without the previous consent in writing of the Engineer; and he shall not assign, by power of atto

Bid Bond Required

medium

…in a timely manner, the bidder’s security, if furnished, shall be returned to the bidder within 5 days of Contract execution, or the bid bond, if furnished, shall become void. The security submitted by unsuccessful bidders will be returned within 15 days of Metropolitan’s execution of Document 00505, Agreement. 5. Withdrawal or Modification of Bids —A bidder may withdraw its bid before the hour f

Locked analysis

All deadlines table

2 dates
ItemDue
Project Award 2016-04-14
of Document 00100, Instructions to Bidders, on or before 2:00 p.m., 2022-09-27

Locked analysis

Required certifications checklist

17 items
  • Include bid bond
  • Include performance bond
  • Attach certificate of insurance
  • Verify general liability insurance limits
  • Verify workers compensation coverage
  • Acknowledge all addenda
  • Include W-9 or taxpayer information
  • Include references or past project experience

Locked workspace

Guest view link to the interactive analysis

Open the full workspace to review evidence, generate response documents, and work from the analyzed checklist.

Analyzing your own RFP?

Email any RFP PDF to rfp@mail.bidterms.com and get a full analysis back in under 5 minutes, free.

Or start your free trial →

Related public analyses

More RFPs in a similar lane

View all